14 (continued)

14 Roof still there. Analysis of collapse (very clear).
An element of luck - in collapses of this nature
(way debris fell).
A toboggan chute down which one man tobogganed
from the 17th floor and LIVED.

15 Distribution steel helping to hold building up.
Electronic conduits helping to hold building up.
Joints between floor units broke and failed entirely.
Horizontal joints between external wall and floor units
broke and failed entirely.

16 From slabs remaining, appears horizontal joints at each floor
level between external wall and floor units also FAILED
ENTIRELY. (based on 8 site inspections)
Floor and wall units well made and of good concrete.
Dr. Bate's site report most significant.
Filling could be broken off with fingers.

17 Quantity of filling inadequate, not properly bonded
(in situ and factory). Elaborates on this.
Polystyrene fell out.

18 Evidence of rotation.

19 Joint reinforcing bars seen hanging and apparently rusty,
but otherwise notably free from insitu concrete fillings.
Tie bars also notably free from insitu concrete fillings.
Did not receive reinforcement drawings till 11th and 17th
July (today is 24th). So great difficulty in making fair
calculations.
Of all these parts weakest are in situ joints.
Amount and disposition of steel reinforcements, particular
consideration.
Absence of top reinforcement.