“Wear Hearing Protection in Your Flats”

Brick panels were falling onto Neptune Street from the upper storeys of Columbia Point, sheets of the building's own skin sliding off and smashing on the pavement twenty floors below. Southwark Council put up protective fans and cantilevered netting systems, to catch debris and protect passers-by.1
Meanwhile, tenants were told it was safe for them to carry on living inside. They didn’t believe it.
The concrete had carbonated. Water had reached the steel reinforcement inside, the steel had rusted, and the rust had swollen and burst the concrete cover off the beams and columns. The only repair was to break the damaged concrete back to bare steel. Contractors were sent in, who began attacking the concrete with pneumatic hammers. Onsite for eight hours a day, five days a week, with noise regularly above 90 decibels. That’s the level at which employers are legally required to hand out ear defenders. Tenant Chris Hawley had to leave his flat on the eighteenth floor of Columbia Point when work was going on. It was unbearable. The advice from Southwark Council? Tenants should wear hearing protection in their living rooms.
Sam Webb called it “totally unacceptable, [it] would be laughable if the situation was not so serious and potentially harmful”. 2 Tired of waiting to hear from the council, tenants had instructed solicitors and paid for their own survey. Webb visited on Saturday 20 February 1993 to carry it out.
What he found was shocking. Brickwork so porous a bucket of water thrown at it vanished in twenty seconds. The metal ties holding the brick skin to the building’s frame rusting through. Concrete crumbling from the inside, its steel reinforcement exposed and corroding.3
The towers had gone up in the brutal winter of 1962-63. [RG7] Bricks had been laid so dry they sucked the moisture from the mortar before it could set. Webb surmised that unauthorised additives like calcium chloride were likely placed into the concrete and mortar, allowing work to continue despite the conditions. The same kind of salt used to de-ice roads, calcium chloride accelerates setting times in cold weather. But it should never be used in concrete structures reinforced with metal. Over time it eats away the bond between steel and concrete.4
The skin of the building had been failing from the day it was raised.
These blocks had been financed over sixty years, to be paid off slowly through the tenants' rent; they were meant to survive to the end of their loan repayment period. They lasted barely half that before they needed major rebuilding work.5
Columbia and Regina Points are still standing today.
- Sam Webb, Report on Conditions found at Canada Estate, 20 February 1993 (WESA_5_6_02/03): Canada Estate, Bermondsey – two 22-storey towers, Columbia and Regina Points, designed by the LCC, built 1962–64 by contractors Tersons, opened 1963; brick panels falling onto Neptune Street; the District Surveyor's Dangerous Structure Notice and protective fans. (The estate passed to Southwark after the GLC's abolition.)
- Webb, Report on Conditions found at Canada Estate, 1993 (WESA_5_6_06/07): pneumatic hammering above 90 dBA; Chris Hawley of flat 72, Columbia Point, unable to stay in his flat; the council's hearing-protection suggestion; Webb's response, verbatim.
- Webb, Report on Conditions found at Canada Estate, 1993 (WESA_5_6_04/05): screwed-up newspaper packing dated Wednesday 15 October 1986 in a 19th-floor double-glazing frame; brickwork absorbing a bucket of water in 20 seconds; corroding/misplaced wall ties failing to bond the two leaves; carbonation and exposed, rusting reinforcement at the 19th floor and in a ground-level corner pier.
- Webb, Report on Conditions found at Canada Estate, 1993 (WESA_5_6_05): the estate built through the severe winter of 1962/63; the likely use of additives (calcium chloride) destroying the steel-concrete bond; bricks laid so dry they drew water from the mortar before it set; “lamentably substandard” workmanship.
- Webb, Report on Conditions found at Canada Estate, 1993 (WESA_5_6_05): the towers built for a minimum 60 years “so that they would survive to the end of their loan repayment period”, yet needing major rebuilding within half that time.
Related Archive Documents
Action Packs
Want to start a community campaign? Here’s a guide to forming or joining a residents’ association.
If your landlord is failing to make repairs, here’s what you can do next.
Frustrated with poor repairs? Here’s a letter template for making a complaint.