WESA_12_1_01p39

A 22 July 1968 (333)
SE Coops, 2nd 3rd 4 5 6 story on 22 July
Bate insp from Leabrook. no one else did
Clark Cleveland K&P Watson Groves New
Wilson stanger.
The reps went to the poor insp but did
not take part in the det exam from ladder.
few joints ex each lev.
a) 1+2 bit 2F1 & 6A1 & 13A1
b 1+4 " 6A2 and crosswall 2A3
c 1+4 " 6A3 " 13A1
d 1+3 " 6A1 " 6A2 and
e V13 " 2F1 " 2F4.
B. My conc which were not discuss
with the others mire exp are given in
para below.
i) The dry post was in post in
all jts examined its thickness
varried between 1 1/4 in & 2" its
quality varied from being friable
to v hard
C II the mstr conc app to be of
good qual but with some
honey combing which was not
mainly detrimental except with
reg to bond of the 'wind' steel
ref to below.
iii As S rein was or had been
pus in the joint substantially
as shown on the drawings.
This found iv In joints 1+2 conc was not
Sept 84 fully compacted beneath the lower
SW 1.ii.85 of the 2 sq twisted bar described
as 'wind' steel in for pos ex.
v In jt 1+4 for slab 6A2, bond bet the
mss & in situ conc had broken
down for up to 2 mtb per slab
vi In jt 1+4 for slab 6A3 bond
bet mss & in situ conc had
broken down far more freq,
for from 4 to 7 mtb per slab