Unknown

A vii Jt H3 broken open along the edge of
the floor slab b51 very little of mistro cone
had remained adhering to the pc unit

viii Jt V13, broken open along the
edge of wall unit 2F1 much of the
grout remained in position and
showed that the reinforcement had
been assembled correctly in making
jt.

ix Evid was of the penetration of the
grout from the mistro cone under
the ribs of the floor units resting
on the wall units but not was
found.

B
x The line mortar pointing between
floor c wall was pro but did
penetrate more than 1/8" - 1/4" and

xi The length of bearing of the
floor units was generally as
shown in the drawing ie 2" in
on cab it was not be 1/4" - 1/2"
but the measurement was dif
to obtain c in one other case
it was in by 1/4"

signed
S Ball
22 7 68.

335
Cas test Moore.
7'6" + 3'0 x 3'0 box.

D 337 Thomas - Eulinga 18/7/68.
with re to the L bars that you
were asking about, it would be
diff, proo unprac to open up the
struc so as to est saw the condin
of the bond between them bars &
cone.

Howev, we have a photo
(which we will try to show
you tomorrow) more that in
at least one case the bond was
not good
DGT 18/7.

WESA_12_1_01p40