Minutes of Ledbury Estate Residents Project Group Meeting

if there is no gas installed in the building. It is half the strength needed in buildings
with a gas supply.
2.16 NB asked went kind of event would lead to this kind of pressure on the building?
AB outlined several risks from the code include explosion from bottled gas, vehicle
explosion near the block, very high winds, an electrical substation in the block.
Many of this risks had been mitigated, with the banning of gas in the blocks,
vehicles not being able to park close to the block, there is no electricity substation in
the block.
2.17 JH reported that it would take Calford Seaden a month to produce a costing for the
new works proposed by Arup to update the option appraisal from 2018.
2.18 TB asked if the foundations of Bromyard were connected to the low rise. AB made
clear the foundations of Bromyard do not connect to the low rise foundations. The
foundations had been investigated by digging a trial pit. The foundations of
Bromyard are well below the surface of the ground outside the block. They are
flush with the building line below the surface of the ground. The raft foundation
does not extend beyond this.
2.19 AB outlined that the radar machine to check the depth of reinforcing rods in the
foundations could detect them to a depth of 100mm. They only way to find out how
deep the reinforcement between the building and the foundations goes is to break
out some of the concrete. This could compromise the stability of the building. The
recommendations had been based on what had been observed.
2.19 SB asked if anything in the assumptions could change the recommendations made
by Arup? AB drew RPG attention to the further work needed in 5.3.4 on p.36. A
geo technical (soil) survey is needed to make sure the soil conditions are what has
been assumed. Some joints have not been well built, and are packed with sand
(rather than sand and cement) and further investigation is needed to see if this is an
issue throughout the building. The jacket around the wall is the solution suggested
to deal with this. More investigation is needed in the façade panels. These would
have to be done before any work is carried out to the block.
2.20 AB explained that walls would have to be removed to install the steel beams and it
would need more work to decide how to do this in practice.
2.21 JH noted that the recommendation is that the steel beams would be 1.2m lengths to
get them into the building. They would weigh 103Kg. There would need to be more
work on how to carry and position these materials.