Minutes of Ledbury Estate Residents Project Group Meeting

2.22 PG asked whether the solution is building an exo skeleton to support the existing
masonry building. AB replied that the strengthening is to carry the loads internally
and take it down through the building to the foundations.
2.23 TB asked if the problem was the materials or the workmanship. AB replied that the
issues were due to the connections between different elements of the building and
the need to comply with the code for LPS buildings above 6 storeys.
2.24 NP asked how the stair and lift core could be rebuilt. AB explained that the work
would need to be done carefully, and that the stair and lift core could be separated
from the residential part of the building without compromising the structure of the
residential part. It would be demolished from the top and built up from the bottom.
2.25 DG asked what effect the proposals would have on the internal design of the
refurbishment option developed by the RPG and supported by residents. SSh
replied that this is not yet clear and the RPG would work through the impact of the
recommendations to understand the effects.
2.26 TB asked if the re-opening of the Option Appraisal would be only for the towers.
MT replied that the area included in the Option Appraisal would be the same area
as considered in 2018.
2.27 TB noted that major works were programmed for the Low Rise homes on the
Ledbury Estate in 2023/24. That looked like a time when there could be work going
on in the towers.
2.28 PG noted that the cost of the works in Hammersmith in Fulham to strengthen two
blocks there was £60m.
2.29 MT asked the RPG to put together a list of further questions to Arup and explained
that the costs put together by Calford Seaden will be brought back to the RPG for
consideration to consider what this means. CH noted that some costs included in
the last version of the Option Appraisal, e.g. refurbishment of lifts, could be
removed and replaced the costs resulting from Arup recommendations.
2.30 PG noted the commitment from the Cabinet Member for Housing in 2018 that the
money was available to refurbish the towers with a right to return for tenants and
leaseholders.
N. Purvis 25.10.19.