2.7 PG asked if Arup’s views of the wind load on the block. AB outlined that the codes
in place when the block was built in the 1960s were lower standards than expected
from codes now. To give the building a 50 year life they would have to conform to
the current codes and standards. Arup had thought that the façade helped bear
some of the wind load. Further investigation showed this was not the case.

2.8 PG asked whether a raft foundation was better than piled. AB responded that Arup
had not looked at the foundations in the previous investigations. The issue was
how the building was fixed to the foundations.

2.9 NP asked why floors were not noted as an issue in the 2017 report but now work
was recommended to strengthen the floors. AB explained that the 2017 report
looked at the junction between the floors and the walls. The investigations in this
report included an assessment of the structural performance of the floors.

2.10 AB outlined that the strengthening recommended in this report was with steel
beams, rather than straps that had been recommended in the 2017 report. The
beams would line up to provide strength through the floorslabs.

2.11 NP asked why the proposed solution was different. AB replied that Arup had been
able to do more detailed investigation and had more time to consider different
options for remediation.

2.12 NP asked if the standard required was for a 20 year life, rather than a 50 year life,
would this mean less works were needed. AB replied there would be no difference
in the works recommended.

2.13 PG noted that the first steel framed buildings were built in 1880s and some were
still standing. AB replied that the design was to meet the current codes that would
give the buildings a 50 year life. They would very probably last longer than that.
The main issues with the building was not the concrete, which is sound, but is the
fixings between the floors and the walls.

2.14 JM asked if residents had been living in dangerous buildings. AB replied that the
risk of disproportionate collapse had been mitigated by the removal of the gas
supply and the use of the 24 wardens. The risks had been mitigated by the
measures that had been put in place.

2.15 PG asked what the 17 Kilonewtons per square metre limit means in practice? AB
replied that this was the standard set following the analysis done after the Ronan
Point gas explosion. A building of this height is expected to withstand this pressure