TBUK4051

Minutes of Ledbury Estate Residents Project Group Meeting

ARCHIVE DOCUMENT
Not stated
24 September 2019

2. Structural Engineer Report Bromyard

2.1 MT explained that there will be an urgent report to the Council’s Cabinet on
Tuesday 29 October that includes the recommendations that Arup are making in
their report on Bromyard. The recommendations from Arup will need to be costed,
and the recommendation is that when that is complete, the options appraisal
process is reopened to take account of the revised costs. The Arup Report and
Cabinet Report were sent to RPG members and were available to all residents and
ex tenants of the estate.

2.2 AB explained that the report included the conclusions from the detailed investigation
works that Arup had done at Bromyard once the block was empty. They had looked
at the building in three parts, the two residential wings and the stair and lift core.
They are connected by a bridge. There was not significant change in the
assessment of the residential area since the report in November 2017. The
investigations of the empty block show that the lift and stair core do not meet the
current regulations.

2.3 The 2019 report had looked at how well connected the buildings were to their
foundations. There was a limit to how much investigation could be carried out
without jeopardising the buildings.

2.4 The works proposed to strengthen the buildings are in three parts. One is to
building a steel frame that ties in the top 8 floors of the building, hung from the roof
to protect in the case of explosion; two is additional strength in the floor slabs; three
is additional foundations at the base of the building.

2.5 AB explained that Arup had looked at a variety of different ways to add to the
structure of the stair and lift core. The solutions considered all made the stairs or
the lift shafts narrower, and they would become unusable. They had come to the
conclusion that it is not possible to remediate the stair and lift core but that it would
need to be demolished and rebuilt.

2.6 PG asked why the 2017 report had not mentioned the stair and lift core, but that is
was being considered now? The Arup Report of Hartop and Lannoy Point in
Hammersmith and Fulham had not considered the stair and lift core. AB replied
that the report on the blocks in Hammersmith and Fulham had been commissioned
by Building Control and focused only on the residential parts of the building. Arup
had not looked at stair as part of the 2017 report because they had been in use at
the time and the focus of concern had been safety in the residential areas. NP
noted that the 2017 report did not mention stairs and lift cores as an area for
concern or further investigation.