3.8 PG was concerned about overengineering of proposed solutions. AB explained that if there were concerns about the solutions proposed, Calford Seaden had structural engineers who could review the report. The solution Arup proposed, would keep the blocks sound for 50 years.
3.9 Residents suggested the LBS Press Office could be more proactive when the Arup Report is received, and should be at the public meeting. MT to brief the Press Office.
4.0 Update Report from LBS
4.1 MT circulated a written report on decant. There are three tenants moving this week. 177 properties are now empty with 21 leaseholders remaining, and 3 in negotiation.
4.2 4 Bromyard tenants are in Sarnsfied and Skenfrith, and 2 non resident leaseholders have temporary accommodation in Sarnsfield, and 1 Bromyard leaseholder is in temporary accommodation. One tenant needing a 4 bedroom home accepted an offer this week. This means all tenants with a 4 Bedroom housing need have been rehoused.
4.3 The Fire Brigade will use Bromyard for training, including using a smoke machine. MT to inform local residents close to Bromyard, not just those living on Ledbury about the time of the training exercises.
4.4 There has been one further report of leaks in the Skenfrith since the last RPG meeting that affected 2 flats. It was resolved on the same day.
4.5 The outstanding Fire Risk Assessment works are metal doors to storerooms in Skenfrith, Peterchurch and Sarnsfield. The doors were for storerooms were delivered and work completed to install them on 28 August. All of the outstanding actions from the FRA reports have been completed.
4.6 Residents raised concerns about residents who were hard of hearing. MT confirmed that any residents who are hard of hearing have had vibrating fire alarms fitted.
5.0 Residents Issue
5.1 SS reported that there had been problems with a contractor doing stripping out of Livesey Exchange. They had dumped debris on the estate. TRA members and the