Ledbury Estate Resident Project Group Agenda

Ledbury Team had challenged them. MT confirmed that the contractor had been
instructed by the Council and he was following up to find out who was the Council
Officer responsible.
7.0 Matters Arising from the Meeting 13th August
7.1 (3.7) CH had updated tracker with a separate line for Peterchurch works.
7.2 (4.5) MT had put an article in the newsletter on fire risk and tumble driers. If
residents have a defective one they can get a new tumble drier for free.
7.3 (4.6) MT had included an article on what to do in case of a power cut in the
newsletter. Phone 105 as an emergency number.
7.4 (5.4) Hot water heating taking a long time to heat up had been remedied.
7.5 (5.5) Entryphone system had been repaired.
7.6 (7.1) Fire doors have been installed.
7.7 (7.2) SSh to provide soil surveys when they are complete.
7.8 (8.1) PT has not yet received report on Door, Window and Shutter Survey of
TRA Hall.
7.9 (8.4) PT had raised an order for bollards in Pencraig Way to be painted so they
look uniform.
7.10 (8.5) MT had amended cover letters with the newsletter for former Ledbury
Tenants so they are printed with one address only.
8.0 Any Other Business
8.1 There was no any other business.