TBUK4046

Ledbury Estate Resident Project Group Agenda

ARCHIVE DOCUMENT
Not stated
5 November 2019

3.1 CH circulated a tracker report. The contractors who are carrying the investigation
works and taking samples for Arup to analyse have completed their work in
Bromyard. Arup have tested the samples and a report is expected in early October
from Arup on the strenghthening needed at Bromyard.

3.2 When the report on Bromyard has been received by the Council, Calford Seaden will
cost any changes to the works since the previous Arup report in 2018.

3.3 Engie had been given instruction to carry out asbestos removal on some empty floors
of Peterchurch, and to soft strip 10 flats.

3.4 NP raised concerns that a resident had soft stripping works in a flat adjacent to them,
and had also come out of their door one morning to see asbestos removal
preparation on their floor. CH apologised for the work. The contractor had not been
given an instruction to work next to an occupied flat.

3.5 There was a discussion on the impact of contractor’s works next to occupied homes.
AB apologised for the disruption and agreed to investigate to find out the cause of
miscommunication and to ensure it does not happen again. AB to report to RPG on
the cause and actions taken to make sure there is no repetition of this will be
provided by 13.9.19. AB to raise the issue with Engie Directors.

3.4 LBS had asked for some extra items in the soil survey. Samples had been taken and
the soil survey will be provided to RPG when received by LBS.

3.5 There was a discussion on what will happen when the Arup Report, setting out more
detail on the strengthening needed in Bromyard is received. LBS to provide RPG
with notice of when the report is expected. NP to check availability of RPG
members so RPG can meet with Arup on the day the report is received.

3.6 Costing of any changes in the works will take up to three weeks and will be carried
out by Calford Seaden. There will be an estatewide meeting when both the Arup
report and the costing information has been prepared.

3.7 There was a discussion on what possible outcomes there could be from the Arup
report and what would happen if there was a large predicted increase in costs. AB
explained that if there was a major change in the predicted costs the Council would
work with residents to consider the implications of this.