REPORT OF INSPECTION CARRIED OUT ON FRIDAY 28th SEPTEMBER 1990.

Inspection carried out by Sam Webb Architect on behalf of The
National Tower Blocks Network.

1.00 The inspection was carried out in the presence of Frances
Clarke of the NTBN.

1.01 Kedge House is a 10 storey block of 40 flats built in the
Taylor Woodrow Anglian system (TWA). This was an adaptation of
the Danish Larsen Neilsen system. It was part of a serial
contract let by the LCC/GLC known as the Morris Walk Series so
named after the first blocks built at Morris Walk in Greenwich.

1.02 There are a number of similar blocks some rising to 14
storeys in various parts of London. They were all built under
this contract. In all there are some 1,800 flats.

1.03 The TWA system was used on two other Estates in London
apart from the GLC ones, Broadwater Farm in Haringey and
Freemasons Road in Newham. Ronan Point was part of this
contract. them as well.

2.00 THE RONAN POINT FIRE TEST 1984

2.01 In 1983 I was invited by tenants living in Ronan Point to
carry out a survey. As a result the building was evacuated in
April 1984 in order that tests could be held.

2.02 I requested structural tests and an insitu Fire Test.
These were set up by the Building Research Station and the Fire
Research Station.

2.03 The Fire Test of 18th July 1984 which should have lasted
20/30 minutes was extinguished after only 12 minutes as the
Newham engineers in charge were concerned that the block might
collapse due to expansion of the floor slabs and lack of
structural restraint to resist this. "The fire was terminated
as the limits set by the engineer were reached with respect to
both horizontal and vertical deflections." p12 Fire Test Ronan
Point 18 July 1984 by B B Pigott and W D Wooley FRS Dec 1984.

2.04 When Ronan Point was systematically dismantled in 1987/88
major defects were found in its structure. These were not
visible from a normal inspection but they were predictable.

2.05 As a result of the 1984 investigations the Minister
ordered checks on all TWA buildings in the UK. Was Kedge House
checked?

2.06 Kedge House like all the Morris Walk series buildings is
'H' shaped on plan consisting of two wings of flats with a
central tower containing the escape stair and lifts. This is
linked to the two wings by simply supported landing panels. The
whole construction is of prefabricated concrete panels.

2.07 Notes of a meeting between The Treasury Solicitors
Department and Eric Bunn Chief Structural Engineer to the
Greater London Council at the time of the Ronan Point Inquiry
on 3rd July 1968 stated that:

"Mr Bunn said that his inquiries which he would have to make
before writing another statement may well cause alarm since the
Larsen Neilsen System introduced by TWA had undoubtedly been
modified as the years went by and it could be said therefore
that the earlier buildings were not as stable as the present
ones."

This was not made Public at the time of the Inquiry and came to
light as a result of searches that I made in the Government
Records which were released to me by the Minister.

2.08 What Mr Bunn said in layman's terms is that the Morris
Walk Series of which Kedge House is one only block were not as
strong as Ronan Point. In the event of an explosion Kedge House
would suffer progressive collapse and there is every likelihood
that a fire could cause unpredictable structural movement.

2.09 The Ronan Point Fire Test caused a fracture of the floor
slab which allowed smoke and fumes to pass up to the flat above
the fire. Movement was such that smoke passed around the
loadbearing ends of the floor slab (H4 joint). Smoke will also
readily pass through gaps caused by bowing non loadbearing
window panels (H1 joint).

3.00 THE INSPECTION

3.01 The inspection was carried out in the presence of Frances
Clarke. We started at the 10th floor and inspected the stairs
and landing areas. We also inspected a flat.

3.02 This building like Knighthead Point on the Quarterdeck was
built subject to the following regulations: The London Building
Acts 1930-39, Section 20, the London Constructional Bylaws and
BSCP CP3: Chap IV (1962). For further explanation see the
report on Knighthead.

3.03 A number of fire doors were broken. Some had missing
glass.

TBUK15044