WESA_7_1_09

Bison or Bull?

ARCHIVE DOCUMENT

Early warnings - ignored !

Old Basford Nottingham:1967: Clerk of Works at the site Mr. James Ligget
conducted water penetration tests. Afterwards 4 inches of water remained
INSIDE the building. He informed Mr. Gordon Stobbs then of Nottingham City
Councils Architects Department (Now head Newark District Council Technical
Services) of the results. Also problems in low-rise links and jointing were
apparent; these were re-jointed at an unknown extra cost(Estimated Thousands £s)
but were still un-satisfactory;Mr. Liggets' tests were ignored and construction
went ahead.

Hillingdon London: 1969: The National Building Agency(NBA) wound up earlier
this year as a cost cutting of the Department of the Environment(DoE),produced
a confidential report for the London Borough of Hillingdon in 1969. But the
findings of that report which revealed the widespread defects on'Bison' Of
water penetration,spalling concrete and condensation,were not publicised, and
there was no government directive as a result.

Monitoring new building was the NBAs' foremost task as a section of the DoE;
in its board of advisors for example was Sir Kenneth Wood then Chairman of
the Bison Group who became a director of the NBA in 1966. Quoting an employee
of the NBA, "You can imagine the atmosphere within the agency at the time, it
was very difficult if one of your board members could be embarrased by a public
statement, and this obviously had an effect on the decisions that were taken ".

Ironically chief architect for Hillingdon at the time the Bison Estates went up
was Thurston Williams, who was managing director of the NBA for the last years
of its life.

However in 1978 the DoE wrote to all local authorities with Bison Buildings
warning them of a number of defects.

Both the NBA and the Building Research Establishment were heavily critised
following the 'Ronan Point' Disaster, for their lack of awareness and
supervision of industrialized building systems.

Bison sheds its coat

Bison 'No cause for alarm' October 20th 1978.
Bison Concrete Ltd. last week denied any cause for widespread alarm about the
high-rise Bison Wall-Frame construction, following reports of failures in the
press at Portsmouth and Hillingdon. Bison has carried out a nationwide survey
into its blocks which has revealed 'no cause for alarm' P.K.Jupp chief executive
of Bison Concrete, told Architects Journal,"if we have any responibility we
will put it right".

At Hillingdon a large piece of concrete cladding panel fell off one side of the
Boroughs' four high-rise blocks.

At Kidderminster(Wyre Forest Council) an entire cladding panel fell off from
eleven storeys up.

At Rugby and at Islington (London) large chunks of concrete regularly fell off
cladding panels, the councils had to erect protective canopies around their
tower blocks for safety.

A 250 kg. cladding panel fell off a Birmingham tower block on the morning the
Hillingdon technical services report was published.

Falling concrete was discovered at Portsmouth in four high-rise blocks in 1977:
together with a catologue of faults in load bearing walls beneath.

There has been cladding panel failure at the Arthur Greenwood Court at Wolverhampton.

WESA_7_1_09
7 of 14