HUNSLET GRANGE HEATING ACTION GROUP

Deputation to Leeds City Council on the 23rd June, 1976.

"The background to our problem is outlined in our report 'Hunslet Grange; An Experiment and it Victims', in which we considered the link between the general structure and specific problems. Dr Charles Wakstein saw a report on draughts in the flats in the local press, and being an engineer he was aware of the possible significance of the symptom.

Dr Wakstein, Sam Webb and David Yeomans visited the flats and we were forceably made aware of the seriousness of the situation. At Councillor Sparling's request they produced a report which he received last week. Their immediate concern is the fire risk:
"The cracks enable fire to pass from unit to unit. This will occur through the floors and walls and does not comply with acceptable safety standards laid down in the Regulations."

Gas was removed from the flats in the late sixties, after the Ronan Point disaster, due to the risk of explosion and ensuing collapse.

It is estimated that at least 2% of the tenants are currently without electricity, at least 50 families are without heat or light. So what happens? In desperate cases the social services provide bottle gas cookers: paraffin or bottle gas heaters are brought in, but what else can people do to cook and keep warm, - further persecution of these people is no answer. But the risk is evident. [passage from "In desperate cases" to "keep warm" underlined by hand]

We fully support Mr Webb's recommendation:
"approach the President of the Institute of Structural Engineers and request that he appoints an independent Structural Engineer to look into the safety aspects of Hunslet Grange and its structural stability."

We are asking for an open public inquiry with resident involvement in drawing up its terms of reference and in the inquiry itself. We have already repeatedly asked to be involved in the future of our homes, so far these requests have been ignored.

There are two main areas of concern: i) structure ii) living conditions. The alarmist aspects of safety must not be allowed to push aside the need to examine living conditions. The inquiry will need to be independent and be held in public to help generate confidence in the tenants as to its impartiality and accuracy. In the last council report tenants were blamed for damp, cold, draughts etc. One can but speculate if the report produced after the Council officers' fleeting visit to the flats this Monday will also blame us, the tenants, for wall movements, panel bending, and cracks at panel joints.

Extreme situations, like Hunslet Grange, call for extreme solutions. The time for cheap jack, punch and judy politics is over; as individuals you must all carry responsibility for the actions of the Council's Officers.