WESA_5_6_05

Sam Webb, Report on conditions found at Canada Estate

ARCHIVE DOCUMENT
20 February 1993

intervals of 5 secs, 15 secs and 20 minutes.

3.08 The area of wall was approximately 2m high by 1 m wide. Approximately 2 gallons of
water were used.

3.09 Water whch ran down the brickwork was quickly absorbed into the bricks. This
absorption was so fast that water only had time to run down 1 or 2 courses before being
absorbed. At 5 seconds the wall was wet. At 15 seconds dry patches were appearing and at
20 minutes the wall was practically dry. The air temperature was about 50 deg F (10 deg C)
and the test was carried out in a sheltered area unaffected by the wind.

3.10 It is likely that when these bricks were laid they absorbed water from the mortar mix
before it had time to set to its full strength. This factor alone could account for the failure
of the panels. (see para 2.13).

3.11 There is evidence of serious carbonation of the concrete. Water has attacked the
reinforcement which is exposed. This has rusted and spalled the concrete cover. This is
affecting the concrete all around the 19th floor and can be seen at ground level in one of the
major suporting piers holding up the corner of the building where the reinforcement is badly
corroded and the concrete cover has been blown.

4.00 WORKMANSHIP

4.01 The estate appears to have been built during the severe winter of 1962/63. It is possible
that additives were placed in concrete and mortar to allow work to proceed even though this
may not have been allowed by the specification. Additives often added to delay the set-
calcium chloride being one- the effect of this is to set up a reaction between the concrete and
the steel which destroys the bond between them. This is often a longterm reaction.

4.02 The standards of work on the 19th floor were poor- misplaced ties, dirty cavities, torn
and misplaced DPCs etc. Many of the inner leaf blocks observed had only been buttered with
mortar on the perpends.

4.03 This "thin" standard of construction might be acceptable for a two storey house on a
sheltered site. Employed on buildings of the magnitude of the two towers and the lowrise
blocks it will lead to failure sooner rather than later.

4.04 These buildings were built for a minimum period of 60 years so that they would survive
to the end of their loan repayment period. Within half that period the whole estate requires
major rebuilding which is proof is any were needed that the original standards of
workmanship were lamentably substandard.

4.05 While inspecting the 19th floor I found evidence of further substandard workmanship
employed in installing the secondary double glazing. At the top external corner of one of the
window units at the corner of the block I found a screwed up newspaper which had been used
as a packing piece. This newspaper was dated Wednesday 15th October 1986.

WESA_5_6_05
4 of 6