Sam Webb, Report on conditions found at Canada Estate

2.09 The estate is built on the edge of the old Surrey Commercial Docks. Some of the dock
basins such as the Canada Dock which is adjacent have been drained and infilled. This could
affect the level of the water table and be one of the causes of the reported ground movement.
2.10 The tenants expressed concern before the House of Commons Select Committee which
looked into the building of the tunnels. They also expressed concern at the state of the
concrete frame and the condition of the brick infil panels. They thought some were loose.
2.11 An external survey has been carried out by a team of specialist abseilers. They expressed
serious concern about the conditions of the brick infil panels and the state of the concrete.
This report was carried out by (firm ?) in (date?) and submitted to (Southwark?)
2.12 Around September 1991 the upper parts of two brick infil panels failed and fell from the
upper storeys of Columbia (?) Point. At this juncture the District Surveyor of Southwark
issued a Dangerous Structure Notice under the London Building Acts 1930/39. Protective fans
were erected around the base of the two blocks.
2.13 The panels appear to have been sucked out by the wind or so weakened by wind action
that they fell out. This will be dealt with in the next section.
3.00 STRUCTURAL CONDITIONS FOUND 20/2/1993.
3.01 A survey was carried out from the scaffolding on the 19th floor of Columbia Point.
3.02 The brickwork was extremely porous. A test was later made to show this, para 3.12.
The mortar was weak and there appeared to be poor adhesion between the bricks and blocks
both in the bed joints and the perpends. The inner leaf appeared to be a form of breeze block.
This would have poor thermal values.
3.03 The galvanised wall ties which were observed where the ends of the return walls had
been removed were very badly contaminated with mortar and would conduct water into the
inner leaf. This would lower the temperature of the inner leaf and cause condensation and or
mould growth to form. The bottoms of the cavity were extremely badly contaminated with
mortar droppings and like the ties could never have been cleaned as the work proceeded.
There did not appear to be any weep holes at the bottom of the cavity.
3.04 Many of the DPCs were torn and badly designed. Some were positioned in such a way
they channelled water into the base of the inner leaf rather than away from it.
3.05 There is evidence that the original ties have not provided a proper bond between the two
leaves allowing the the leaves to act independently of one another. This could well have been
a contributory factor in the failure when parts of the panels fell out (see para 2.13).
3.06 There was no evidence of a compression joint at the top of the brick panels. Thermal
expansion and or shrinkage of the frame will introduce undue stress at this point. In extreme
cases the panel will bow outwards.
3.07 A test was carried out to ascertain the absorption of the brickwork. A full bucket of
water was thrown at a wall and the rate of absorption observed. Photographs were taken at