Draft Script

V Yes.
E Underneath, there is a lime mortar joint to be filled.
Is that right?
V Yes.
E Do you rely on that lime mortar joint to give any added
restraint?
V The lime mortar? No.
E (with gestures) It would be virtually impossible to pack it in
any way into 1/8".
V Quite.
E In the construction of this building, the site concrete
is put in position on the site after the wall has been
placed on top of the 2 nuts - that is right is it not?
V No sir.
E Or before? Before - site concrete. I mean the dry mortar
pack. I'm sorry. I did not mean site concrete. The dry
mortar pack is that put in before the wall is lowered on the
nut?
V (sadly) No, sir.
DIAGRAMS NECESSARY TO SHOW JUST HOW DRUNK HE IS
GRIFFITHS After the floor above has been put in?
V Yes.
EVE (half asleep) I am sorry. I was not precise about it. I was merely
dealing with the order, not the time factor.