Skip to main content

Content Warning

Archive material discusses fatal building failures and contains potentially distressing elements.
IMG_0784

Draft Script

ARCHIVE DOCUMENT
Not stated
Unknown
Start of document

V If you had all teeth loaded. Does that answer your question?

E I think it does, but I have not understood it.
It sounds as though it was answering a question.
It is a question of not hearing...

THERE ARE SOME GIGGLES

GRIFFITHS Can I ask one question? How many teeth in all are there
on one end.

V About 15 or 16.

GRIFFITHS Thank you.

EVE (SLEEPY DRUNK NOW) You pack 4 at each end?

V About half that number.

E Half the number? Are you saying that there is no real
need to pack any with mortar?

V The restraint offered by the load going through the teeth
amounts to the same.

E Yes, I get what you say. In that case what is the value
of the mortar pack?

V I am sorry, were you earlier talking about dry mortar pack
or lime mortar pack?

NO ANSWER

E As I understand it, this floor slab rests in the top of the
wall.

V Yes.

E Which has some restraining effect upon the wall.

V Correct

E But, but in addition to this, packing is put in, You put
some concrete in and you put some mortar packing in. Is
that right?

V Yes. You were I hope referring to specifically a dry pack
at the top of the joint when I answered it was vital?

E I follow. I had better have the plan before me. Just a
moment. We have lime mortar underneath...

HE GETS A WARNING SIGNAL/AND WE HAVE ALSO GOT SITE CONCRETE ON TOP. he says.

E Site concrete you regard as vital, is that right?

V Site concrete? Certainly. Yes.

E Why? Because it transfers the load from the wall above down
to the floor below.

End of document
IMG_0784
299 of 525