Draft Script, Act II: The Builders

GOODFELLOW shuts him up. I do not want to go into too much detail at
this point.
VW Let us do something about it now. Let us not wait again
until it is too late.
GOODFELLOW About a code of practice for system building.
VW It is long overdue! I have sat listening ...
LAYFIELD You heard Mr. Bowen say that this building had not been
tested? Such tests as were made took place after Ronan
Point was erected, two of them after the collapse.
VW Leeds University were asked for a report in the Spring of
1967. It is difficult to get tests done at universities.
LAYFIELD You wanted useful guidance.
VW Most certainly.
LAYFIELD Well the results were inconclusive as regards the behaviour
of mortar joints under direct shear. Further investigation
was recommended but not done. The second test on joints
was going on during the period of the collapse. The third
test was initiated after the collapse. There were no tests
to illuminate the behaviour of the H.2 joint and no tests
simulated the conditions at Ronan Point.
MAY I want the record from Newham, based on Mr. North's
recollection, that TWA were asked if the LN system would go
up to 22 storeys.
VW (after a I believe TWA discussed this at length with LN in
look from Denmark. There must be some correspondence about
North) it.
MAY Find it.
EVELEIGH Did LN impose a standard?
VW In a lot of instances we told them as much about the
system as they toldus.
EVELEIGH You designed these joints?
VW (pause) Yes!
SIR A.P. I hesitated to add to your burdens but when this series of
buildings was designed you were not the Senior Engineer in
charge.
VW No. There were a lot of things I would not do again, sir.
AP We have all been in that position.
Would you welcome compression tests?
VW I would welcome any test, sir.