Draft Script, Act II: The Builders

BARNES (looking at paper)
You have said that this system is more suitable for tall
blocks. Why?
NORTH
Because two or three-storey blocks are more apt in
traditional style, especially the economical traditional
brick.
MAY
Is system building quicker?
NORTH
It takes much the same time. The advantage is that
unskilled labour could be used.
MAY
That does not disturb you.
NORTH
I have often shuddered that the lowest paid labourer offtimes
if not watched will bend a reinforcing bar to make his
task a little more simple.
WRIGHT
Do you think R.P. was built with unskilled labour?
NORTH
Certainly not.
WRIGHT
A saving on labour then?
NORTH
On bricklayers and plasterers, the latter are completely
eliminated.
WRIGHT
A saving of craftsmen who have to serve an apprenticeship?
NORTH
Counterbalanced by the men engaged at the factory, and
there are men like Mr. Groves, for example, our Clerk of
the Works, a man so conscientious it has affected his
health.
WRIGHT
Can you tell us the names of your well-known colleagues,
the ones who share your opinions on the stability of the
building.?
NORTH
It was not done in any manner of commiseration - I think -
it was the Chief Architect to the Ministry and the Chief
Architect to the G.L.C.
GRIFFITHS
I should like to hear from Mr. Watson again.
WATSON
This building withstood a blast of severe proportions and
all that occurred was similar to an earthquake - a
horizontal cracking effect.
GRIFFITHS
What should be done?
VW
The explosive element should be removed, a fine imposed on
the taking in of large quantities of volatile liquids or
gases, camping equipment, what have you? There should be
a further inspection of the straps, due to the threat of wind,
they should be welded.
The cores in the south-east corner should be opened up. There
should be continuity steel over the joints. I would use
epoxy resin in places and probably cover it with asbestos.
Omit every other tooth on future and introduce hoop bars.