The point, Mr. Eveleigh, was the design philosophy and
corresponding details of construction of the main flank wall
to floor joints and similar joints are inconsistent because
the ends of the floor slabs were not fully clamped in these
joints, and in any event were taken as simply supported for
some purposes. Rotation in my view tended to occur over the
middle portion of each floor slab bearing, and probably will.
The consequent effect of the reduced restraint of the load-bearing
walls I suggest needs reconsideration. The anchor straps between
the floor slabs and the walls may have been insufficiently
fixed, and are known, in fact, to have been insufficiently fixed
in some place, and therefore their effectiveness must be placed
in jeopardy.

The sufficiency and soundness of design approach to and the
actual safety margin in the main load-bearing walls, especially
the load-bearing flank walls, [illegible] may be doubtful, bearing in
mind (a, be, c, d) (e) possible risks from levelling bolts
improperly fixed, i.e. nuts not loosened off properly.

The quality and strenghhof the actual bonding between in situ and
factory-made concrete is doubtful and may be poor in a number of
joints. I have to say I would not be prepared to pass it as good.

The quality and strengh of bonding between the insitu filling
and such steel reinforcement as has been provided in the joints
would seem on present evidence to be poor, at least in some joints.
I am distrubed by the evidence I myself saw.

The metallic anchorages of each corner stack to the core
of the building are so few in number and potentially reliant
on the bonding of the insitu filling as to be out of balance with
practical considerations, and the efficiency of at least some of
these anchorages is very questionable.

The quantity and therefore the efficiency of the day-to-day
supervision of the works on site, both independent and by the
contractors, appears insufficient in my view, and leads to poor or
questionable workmanship on site, notably in compaction of the
dry pack bedding under flank walls and probably other load-bearing
walls,

tthe fixing of floor to wall anchor straps, infilling of in
situ joints and questiolable compliance with the specified
requirement for slacking off the nuts in the levelling bolts
in the walls.