270/ Elec in Ashford Madx and cut off after
in substation 1000 houses affected D.Mail 17.5.68
STATEMENT BY ARCHITECT WORKING FOR T.W.A.
217 Missing at HQ of T.S.
Hisson Green.
* 7 We (in witness?) left the Coy 2 weeks before
the collapse, substantially we were unable
to agree with the management as to
their method of operation of the system
which made it difficult to produce satis
factory workable drawings, and we did
not wish to be in any way responsible
for what we were doing. We would again
wish to place on record our disagreement
with their method of working and
disclaim any responsibility for the
manner in which they may continue
with the Hisson Green scheme.
30 The lack of indep attendant professional
supervision of the activities of the Coy
are such that the Hisson Green contract
was tendered and priced on the basis of
a [illegible] form of constr. bearing no
resemblance to N.N. Is the NBA aware
that this can happen for systems to which
it may have given its cert. For verif
ication offer Docs may be examined.
31 The coy does not carry out the nec
R & D.
For example for some time it has been
known that some of the internal sandwich
cladding panels warp and bow. This might
be caused by conc shrinkage, which
might for example be caused by U/F
elec heating or other heating.
32 In spite of having been required
by PC and by the Archts to make
sample face panels and test them
and monitor them to ascertain
the precise cause of this bowing,
such R & D was not carried out.