The reason I cannot inspect floor slabs is that they
are stacked one on top of another after curing. The
other units stand upright and I am able to walk
round them.
The fl slabs as I have stated cannot be insp
and completely insp due to stacking, but I and the
contractors shop inspector are checking these units
while being manufactured. I also inspect them in
the stacks for soundness of the bearing rests
poorly con henwade.
___________________________

Williams 18/9/1 g
It is common practice for a&s to issue Ppc hand
app for build where complete stime calcs are req
before units have all been checked, on the
undertaking that no wk will commence on
site until the calcs have all been checked.

BRS. Bali. 18 July 68
Thus all the countries whose docs have be
obtained point out the need per continuity in
prefab constn.

* WBA cover 22 Doc 24
N BA. Cleve Bau - Marths. 14. 6.68.
Cleve Bau
* ms by E Chan 18 May 68 10 - 11 30.

5 a Walls altho the intensity of press dev by exp
cannot be udily established is pos to estimate
press under which each elem of flat in ?
wed fail shine and thus to eden the elem
which wed fail at the least press. An
J4 Walls as with this proced pos to the gable LB
D4 Rema wall being the most likely to have failed
F4 TWA first at an int press in the order
H4 Bison of 200 lbsq ft or 1.4 psi.

C4 12M B4 B5 B6 Camms See P 55-56
B4 Comms C4 C5 12M Jesp. Day 11.
G4 Tromba D4 D5 Rema. also Day 12 p 2.c.
E4 SKARNE F4 F5 SKARNE CRUDENS. See also
G4 G5 TWA Rodin evidence
H4 17 5 H6 TRACOBA.
J4 J5 J6 BISON.
WATES.