On the 15th November 1984 the Council voted to demolish a further
five blocks, later another two on the Estate were added making a
total of eight blocks out of nine. The N.T.B.T.C. recommend that
any decision on Hume Point made by the Council can only be made
following further investigations on one of the other two similar
blocks. The dry pack defects found in Ronan Point are likely to
be found in Hume Point.
On the 21st February, 1985 a Conference was held into Taylor Woodrow
Anglian construction and Ronan Point at the G.L.C.
The B.R.E. announced that eight floors should be removed from the
top of Ronan Point and the other blocks on the Estate to reduce the
deadload at the base and to reduce the risk of collapse in a fire.
They also confirmed the dangers from high winds.
In May, 1985 the B.R.E. published its report on Ronan Point and Taylor
Woodrow Anglian construction which it was instructed to prepare by
the Minister on the 23rd August, 1984 following written Parliamentary
questions, the N.T.B.T.C. had requested the MP for Newham South Mr
Nigel Spearing to ask.
The Minister also asked Local Authorities in October 1984 to check
144,000 system built flats and houses in England and Wales on safety
grounds; 110, 000 of these are high flats. At the same time the Ronan
Point files of the Inquiry were released before the 30-year Rule
to Sam Webb. Many were missing.
The B.R.E. report of May, 1985 confirmed what the N.T.B.T.C. had
told the Council one year earlier that Ronan Point could suffer
collapse from the effects of:
* Fire
* High Winds
* Its own weight
* A bottled gas explosion