On the 18th July 1984 a fire test was held in a flat on the third floor
of Ronan Point. Scheduled to last for at least 30 minutes it was halted
after 11½ minutes because of the risk to the building from collapse.
Load bearing structural floor to wall joints including H2 and H4 joints
had moved as had been predicted by the N.T.B.T.C.
Within two hours the Building Research Establishment, the Fire Research
Station and the Consultant Engineers, Building Design Partnership
pronounced the block structurally sound.
At a five-hour long public meeting on August 4th, 1984 in East Ham Town
Hall over 400 tenants from the Estate were told that they had nothing
to worry about. The Senior Partner of Building Design Partnership, the
Engineer James Armstrong told them:
" As a father and grandfather, I would feel as safe as my
children in those blocks as any other."
(London Standard (Front Page - Lead Story) 6th August,
1984.
It was a sincerely held view but it was wrong. Further more the tenants
did not believe him. Neither did Councillor Jones.
Later in August 1984 the tenants forced the opening up of the H2 flank
wall to floor joint from the outside of the building. This revealed
alarming bad workmanship and cracking panels as had been predicted in
the reports to the Council by Sam Webb earlier in the year. These had
been predicted as far back as 1970 by Sam Webb to a meeting of the
Institute of Structural Engineers on the 5th Amendment to the Building
Regulations brought in as a result of the collapse to Ronan Point.
In October, 1984 Building Design Partnership recommended on safety grounds
the evacuation of tenants from the lowest eight floors of the other five
blocks similar to Ronan Point on the Estate. This was to prevent the
collapse of a block in a fire.
On the 9th October, 1984 Newham Council voted to demolish Ronan Point.