Statement Response from Ledbury Action Group and Ledbury Tenant & Residents Association

ARCHIVE DOCUMENT
Not stated
11 September 2017

21. Why were Category 4 Fire Risk Assessments only promised by Southwark following instruction
from Arnold Tarling? Why didn’t Southwark do these sooner?

22. Why was the gas issue only explored upon the instruction of independent experts; Arnold Tarling
and Tony Bird, who were brought in by residents? Why didn’t ARUP pick this up?

27. One resident attended Peckham Pulse to take a shower but the staff there had no idea of the
arrangements made by Southwark.

28. a) How can Southwark make promises regarding major works and ‘excellent’ refurbishments
before they’ve received the full ARUP report due on 20th November?

b) Southwark have not yet surveyed all the flats for potential gaps. The kitchens and bathrooms and
entrance halls have not been inspected at all. Air gaps were found around the old gas risers in the
kitchen cupboards by Arnold Tarling, directly connecting flat to flat all the way up the buildings. In
order for Southwark to be thorough, they would need to inspect behind kitchen units, cupboards
and in bathrooms and all other areas to ensure that there are no gaps there through which fire could
spread.

32.a) The new immersion heaters have been leaking, causing misery to residents across the four
towers. Many residents were told by the staff based at the TRA hall to call the Southwark Repairs
Line to report these leaks. These delays meant in several cases, water got into the electrics, with
lights blowing and fuses short-circuiting. One resident described smelling burning and smoke coming
from her light fitting and being faced with having to move into temporary accommodation as a
result. The contractors; Smyth & Byford, have told residents that 20 new immersion heaters a day
(as promised by Southwark Council) is not viable and that they can install 10 per day maximum.
Residents report up to 5 missed appointments for these installations, with many residents booking
time off work to allow access.

b) The asbestos removal which has been carried out in recent weeks has been seemingly haphazard.
Many residents have been in situ whilst asbestos was being removed. Inconsistent levels of safety
equipment have been used.

34. Residents were told that the electricity supply would be upgraded by 6th September. The
deadline has been missed. The choice and installation date of new cookers is still unclear.

37. Residents are already feeling cold. What happens if the district heating installation is also
delayed?

40. a) Residents are reporting delays, some up to 4-5 weeks between viewing properties and being
allowed to sign their new tenancies. Residents are asking that this process be sped up.

b) Some residents have been shown properties which are not in a fit state for viewing. Two residents
(one accompanied by her young children) have been shown around former squats with drug
paraphernalia laying around. Why are properties not visited by Southwark to ensure they are in a
safe condition prior to viewings?

45. Again there is miscommunication taking place with the staff at the TRA hall. Information
regarding rehousing is inconsistent.