TBUK4103

Danielle Gregory, Ledbury Estate Evidence Statement

ARCHIVE DOCUMENT
Not stated
6 March 2018

this to Southwark Council and on 29th June 2017, Peter Clarke returned again, this time with
Amjal Khan, a Fire Safety Officer, and, upon my request, an independent structural engineer;
Mark Mason of Sinclair Johnston Surveyors.

Their findings on this occasion were that the gaps posed a significant fire risk in that they
breached compartmentation. Upon more intrusive inspection, whereby they removed the
architrave joints from the corners of the rooms, and pulled back the carpets, they realised that
they could see into the flat below. Some gaps measured up to 25mm wide and more than
110mm in length upwards into the flat above. Southwark immediately changed the 'Stay Put'
Policy in Bromyard House to a 'Get Out' Policy and called in 24 hour fire wardens to patrol
Bromyard house, and began temporary work to fill the gaps in my flat, stuffing them with fire
resistant mineral wool and sealing over with mastic. Knowing that my neighbour in another part
of the building also had these gaps, I insisted that Southwark Council look at the other flats, and
the other three tower blocks on the estate. It was subsequently discovered that gaps of the
same severity as the ones found in my flat, and worse, were prevalent throughout all four tower
blocks and work began to seal all gaps temporarily. Southwark also employed ARUP engineers
to look into the structural integrity of the blocks.

In the meantime, a Guardian journalist put me in touch with a group of independent experts,
including Sam Webb (RIBA architect and Ronan Point expert), Tony Bird (Independent Tenant
and Leaseholder Advisor) and Arnold Tarling (Chartered Surveyor and Fire Safety Expert) - Mr
Tarling and Mr Bird visited my flat and immediately Mr Bird seemed horrified when I confirmed
that I had a gas supply to my flat, and he began informing me about Ronan Point and Large
Panel System builds. He explained that our tower blocks should not have a gas supply at all. At
this stage, I was not educated on these matters enough to comment, however I invited Mr Bird
and Mr Tarling to a residents meeting on 11th July 2017 where Southwark Council and ARUP
Engineers would be making a presentation on their findings at Ledbury.

At this meeting, ARUP displayed a PowerPoint presentation, informing the residents that the
gaps did not pose a structural issue. ARUP were not asked to comment on fire safety and so
refrained from mentioning anything in regards to fire. At this meeting Mr Bird stood up and
asked ARUP and Southwark Council 'are you happy that there is gas in these buildings?'
Southwark and ARUP responded that the Ledbury blocks were a different type to Ronan Point
and therefore safe to have gas.

The following day I undertook a deputation to full council assembly at the Southwark Council
Tooley street headquarters where I urged the councillors to undertake wind loading and
pressure tests on the Ledbury Estate to ensure that they were not at risk of the same type of
progressive collapse seen at Ronan Point.

On the 10th August 2017, Southwark Council turned off the gas to the Ledbury Estate tower
blocks after ARUP confirmed that upon closer inspection of the blocks, they could not find any
evidence of the structural strengthening that they would have expected to see in blocks built

TBUK4103
103 of 137