TBUK4090

Tony Bird, Ledbury Estate Southwark Time Scales

ARCHIVE DOCUMENT
Not stated
August 2017

Tenants that their view about fire safety was correct and our views were incorrect and
misplaced.

Finally, their own Consultant Engineers ARUP confirmed on August 8th that what we had
been saying all along was indeed correct. As a result, the Council ordered the immediate cut
off of gas supplies to all 4 blocks and advised the residents that they would all need to move
out of the flats.

I am however concerned that the Council is promoting the idea to their Tenants and
Leaseholders that, if they move out, it will only be for a short temporary period to allow for
remedial refurbishment works to take place and then they can move back. This is a
misplaced illusion in my view. There has never been a making completely safe refurbishing
of any large panel system built tower block in the UK. If one draws upon the experience of
the demolition of the demolished 9 large panel tower blocks at Ronan Point in the mid-
1980s where it was found that every single H2 joint was incorrectly constructed and did not
correspond to the original drawings, it would be reasonable to assume that there would
exist the same problems at Ledbury Estate. The large panels themselves were also found to
have been moulded incorrectly, a product of poor quality control when the panels were
originally made in the factory.

These defects are illustrated in some depth in the 1984 BBC Documentary ‘The Great British
Housing Disaster’ where there are a series of interviews with the original construction
workers who put together the panels on site. They freely admitted that because they were
paid on a piece rate basis that there was a massive incentive to cut corners to make sure
they benefited from the piece rate bonuses. By cutting corner they explained that if a bolt
did not at first allow for a fit, that they just cut it off. They also described how so many of
the large concrete panels themselves did not fit properly. Their views are horrifying as is the
complacent attitude by the powers-that-be to operate an effective quality control
monitoring system.

So what should happen now; The Council will clearly need to hold a Housing Options
Appraisal about whether;

1. To somehow make safe/refurbish the blocks once they are empty of residents. It
would be totally unfeasible to carry out this type of exploratory investigative work
with residents living in the buildings, after all, it may mean that every single large
panel and joint would need to be opened up and examined before it is somehow
repaired. The scale and massive cost of this untried and untested work would in my
view be prohibitive. It has never been done before and I would be very wary of
experimental efforts to attempt it now. Furthermore, even if the buildings could
somehow be made safe/repaired, they would still not mean that the main building
societies and banks would be prepared to lend mortgages to would-be purchasers.
Existing Leaseholders would, by the contractual law of their leasehold contract with
the Council, have to be charged their designated share of the massive repair costs, if
they were to decide to retain their ownership. Unless of course that the Government
would put forward an accredited central government funding budget that would