LEDBURY ESTATE L.B. SOUTHWARK TIME SCALES

■ All 4 Tower Blocks are Taylor Woodrow Anglian Large Concrete Panel construction and have 56 flats each.
■ Ronan Point partial collapse; May 16th 1968.
■ Government Minister of Housing orders all large panel systems to have the gas removed and everyone to be given gas cookers on August 15th 1968
■ Ronan Point Inquiry started June 1968 published 8TH November 1968. Ronan Point Inquiry did not cover issue of how to build safely. Building Industry wanted a standard in order to sustain their big contracts (and huge profits) to build tower blocks.
■ Government issued Circular 62/68 which laid down that tower blocks above 5 storeys need to be able to withstand explosive pressure standard of 5lb per sq inch (34kN/m2)
■ None of the blocks built by this time could pass this. All failed. Government under pressure from the industry and politicians then reduced the standard to 2.5lb per sq inch (17Kn/m2) but with all gas removed, laid down in new Circular 71/68.
■ Sarnsfield House; Initial lettings November 1968. Built to similar standard as Ronan Point.
■ In summer of 1969, GLC and Government approved the bolting on of angle irons in order to improve the bearing of the end of the floor slabs. This work never took place at the 4 Blocks at Ledbury Estate. Unlike other TWA Blocks.
■ Skenfrith House; Initial lettings January 1969
■ Peterchurch House; Initial lettings June 1969
■ Bromyard House; Initial lettings September 1969. (it is understood that when Ronan Point disaster happened in May 1968 the actual building of this block was interrupted. The initial 3 floors built were demolished and the building re-built to its present height.)

If the timescales identified above by interviews with original Tenants are correct, then it is likely that it would only have been possible for Peterchurch Hose and Bromyard House to be designed to comply with the requirements of Housing Circular 62/68.

At the public meeting held on the 11th July 2017, it was said that the 4 tower block buildings all complied with Circular 62/68 and were therefor safe for a gas supply. This would prove to be a big mistake by the Council ; they clearly wanted to give re-assurance to their Tenants. This mistake was made I believe in good faith by the Council.

The matter of gas was not mentioned by either LB Southwark staff or the ARUP Consultant Engineer in their main presentations to the Residents. It was raised however by both Arnold Tarling (Independent Surveyor specialising in Fire Safety) and Independent Housing Consultant Tony Bird who had inspected a number of flats on the previous Sunday and had interviewed a number of Tenants whose homes suffered from cracking and subsequent breaches of compartmentalisation. For the next 4 weeks, the Council maintained to their