Questions for Arup, LBS and Salford Seaden from Ledbury Estate RPG

6. The report mentions on p.3 that fire safety requirements have not been taken into
account. How will this be taken into account in the design and costing of the works
proposed? FRA works are included in original options appraisal. These will be reviewed and
updated as part of the detailed design stage and in accordance with current legislation
Which rooms will steel beams be installed in on the top 8 floors of the block? Steel hangers
and beams will be installed in all rooms in the top 8 floors.
7. With floor strengthening with reinforced screed, what height will be left in the
rooms? Will this fit within minimum room heights set by planning and building regulations?
The existing floor to ceiling height is 2.4m, the current scheme will reduce the floor to
ceiling height to 2.1m at its lowest point.
8. With floor strengthening with reinforced screed, what height will be left in the door
openings? Will this fit within minimum standards set by planning and building regulations?
Openings will need to be increased in height.
9. Where external wall panels (with insultation) are replaced, what would they be
replaced with? Requires further design and agreement with Planning and Building Control
10. The weight in the block will be increased by installing extra strengthening such as
steel beams. Why is it necessary to remove non load bearing walls to reduce the weight?
The assumption to remove the non-load bearing walls was to minimise the load increase on
the existing structure. The option to retain these could be considered during design
development.