TBUK4062

Questions for Arup, LBS and Salford Seaden from Ledbury Estate RPG

ARCHIVE DOCUMENT
Not stated
31 October 2019
Start of document

Questions for Arup, LBS and Calford Seaden from Ledbury Estate RPG

31.10.19

1. Would the replacement filling between the inner and outer leaves be sufficient to do away with the proposed internal insulation? Will need to be confirmed during final design.

2. Poor site workmanship pg 8 - there is no mention of the panel to panel connections being missed as alleged in the video "The great British housing disasted". I hope this confirms that this was unfounded. In general, investigations to date have not highlighted issues with poor workmanship. The flank wall to flank wall connection was investigated in 5 flats; a vertical lacer bar was found to be present in all locations. There was no evidence that any elements had simply been missed during construction (as referred to in the film) but it is difficult to be certain.

3. Notional removal pg 13 and tying pg 14. While the roof truss and steel hangers seem to support floor panels in the event of removal of flank/cross wall panels from the 8th floor up it's hard to see how this is achieved from ground to 7th floor if a flank wall panel is removed. The diagram on pg 14 looks like an internal example. The assessment of resistance to disproportionate collapse found that the panels from ground to 7th floor are able to withstand a lateral pressure of 17kPa through arching as discussed in Section 5.1.1. This is the case for both flank and cross wall panels.

4. Assumptions pg 21. 2nd bullet point. The findings are representative of Sarnsfield which has an identical layout. Skenfrith and Peterchurch are 3 and 1 bed throughout. The report focuses on Bromyard House, further investigations will be required for the other blocks to confirm they are similar. It is assumed that the principles of the proposed scheme can be applied to all of the blocks despite some differences in internal layout. The number and location of the hangers may vary but this is not expected to have a significant impact on cost.

5. Jacketing of the shear wall. Is this the corridor wall opposite the bedrooms? Assuming it is, how will the jacketing be applied as illustrated where this wall meets cross/party walls without breaking through them? Also, won't this make the doorway from hall to corridor too narrow?

The shear wall to be jacketed is highlighted in the figure below. The reinforcement for the jacketing can be inserted through holes drilled into the cross wall. The impact on the size of the doorway will need to be considered by LBS; if necessary it may need to be widened.