TBUK4059

Meeting, TRA Hall, Ledbury Estate, Draft Minutes

ARCHIVE DOCUMENT
Not stated
24 October 2017

4.17 Q: It seems in some ways we are getting a new tower with some original features. How
much extra work is this?
AB: It is quite a lot more, but I can’t give you a number.
4.18 Q: The original Arup report described a bowing effect caused by heat as responsible
for the cracks opening. Would this solution make any difference to that?
AB: We haven’t looked at that here, but if a new skin is being put on, we could take
the opportunity to put in more insulation. It would have to be designed and thought
about carefully, but it would improve that situation.

5. NEXT STEPS – CLLR KIERON WILLIAMS
5.1 KW said: This is a conversation with all the residents about what we do next. We need
the costs to do that, and it will take a little while to get those from Calford Seaden.
5.2 As this is very different to last time, I would like to put this back to the residents
alongside the council, and look at what this will cost and what that means for the
homes.
5.3 This is new information, and much more detailed. We need to ask, what do people
think is the best solution?
5.4 The Cabinet report will ask for the costings and once we have those we will go back
again to the residents of the estate and take the time to look again at what might be
the best option.
5.5 A resident asked: Whether KW would stick by the commitment made by his
predecessor – that unless the residents vote for demolition of the tower blocks it will
not happen?
KW said: I don’t know, and it depends what the costs come back as. If the new costs
are astronomical it would not make sense to go ahead. I just want to work through
with you what as residents what is right to do. I only want to end up with an option
that’s right for the residents on the estate.
5.6 A resident asked: In order to help the funding of the works they will build more houses
on the estate. Is 81 homes still going to be feasible to meet these costs, and if not, will
there be thought given to what might be proposed?
KW said: I am suggesting that we look at all the options. The things that are givens: I
wouldn’t want to see anything that results in fewer council homes than we have now.
5.7 A resident asked if KW is referring to the towers or the whole Ledbury estate, when he
talks about ‘the estate’.
KW said: It is only the area that has been previously looked at – bounded by a red
outline in earlier plans.
5.8 MT suggested that he would include this commitment in next week’s newsletter.
5.9 A resident asked: In effect, if the repairs go ahead, leaseholders will be getting a
significantly less attractive flat, albeit a safer one. Would the council consider giving
leaseholders an enhanced valuation of their property? The property’s market value
will fall if it is smaller and less attractive.
KW said: It is a good question, and I will take that away and think about it.

TBUK4059
59 of 137