• Inspections to all fire doors to ensure they are thirty minutes fire resistant and have
appropriate self closing devices. If there is any doubt regarding the validity of a
‘notional’ door it will be replaced.
• A ‘zero tolerance’ approach to all items in the common areas to include doormats
and pot plants.
• All flats have an enhanced LD2 part 6 fire alarm system meaning we have coverage
to all rooms in the flats except the bathrooms. All flats are being checked to ensure
their fire alarm is in full working order.
• Initial inspections undertaken by a Senior Building Surveyor and our Senior Fire
Surveyor indicate there are no potential breaches between the dwellings and the
escape routes and that the escape routes are fully protected.
• This building has no cladded materials.
• An interim fire alarm system covering the common areas at every landing.

All of these measures were fully complied with and as long as they remain pending a
permanent solution to the compartmentation issues, residents will not need to leave their
homes.

A team of technical staff started to assess all of the flats within the four tower blocks from
Thursday 29 June. Contractors were appointed to carry out remedial works and continued
to do so over the weekend and into the following week.

Arup, the leading civil engineering firm, were commissioned on Friday 30 June and started
work on Monday 3 July. They carried out internal investigations to 4 flats, three occupied
and one empty, and also erected a tower scaffold to the exterior of the building to inspect the
structure externally.

Arup wrote to Dave Markham, Director of Asset Management, on 5 July 2017 to advise that,
‘Arup engineers have found no structural safety issues but are continuing to investigate and
will make recommendations for remediation work if required’.

The LFB Borough Commander wrote to residents of the four tower blocks on 5 July 2017 to
advise them of the ongoing dialogue between the council and the LFB and the
appropriateness of the council’s measures in view of the compartmentation measures as
below:

‘Southwark Council then took the precaution of placing fire wardens on each floor of each of
the blocks and briefed them to evacuate the entire block should a fire occur. Needless to say
this is contrary to the LFB policy of ‘stay put’ but entirely appropriate if there are doubts
regarding the compartmentation of a building.

In addition to the implementation of briefed fire wardens a range of other measures have
been actioned that add to your safety in regard to early detection of fire, keeping means of
escape clear and protected and evacuation protocols. Arrangements are being made to
secure long term solutions and rest assured that the enhanced measures currently in place
on the Ledbury Estate, will not be lifted until these solutions are satisfactorily actioned’.

Communications to residents have been ongoing. A control centre has been set up in the
Ledbury estate TRA Hall. This hall has been constantly staffed by council staff since Friday