Ledbury Estate Fire Safety Compartmentation Issues

Appendix A
Ledbury Estate Fire Safety Compartmentation Issues
In response to the issues raised by the tragic Grenfell Tower Fire, the council and the LFB
jointly held a residents’ meeting to listen to and respond to concerns about fire safety at the
Old Kent Road Fire Station on Monday 26 June 2017.
At that meeting, a resident reported large cracks in her flat in one of the four Ledbury Towers
on the Ledbury estate. She expressed concern that these cracks breached the
compartmentation of her flat and therefore compromised fire safety.
The Ledbury Estate is situated at the top of Commercial Way and comprises low rise blocks
and four tower blocks. The tower blocks, Bromyard, Peterchurch, Skenfrith and Sarnsfield
are 14 storeys high, and each block consists of 56 two bedroom flats comprising 224
properties in total.
The blocks are concrete frame construction, built by Taylor Woodrow between 1969 and
1970 and are former GLC properties which transferred to Southwark Council in 1982.
Following that meeting, the Strategic Director Housing and Modernisation, Gerri Scott,
contacted the resident by email to arrange a visit by the Fire Safety team to inspect the
cracks. In a series of emails between the SDHM and the resident, photographs of the
cracks were provided, along with specific advice that the resident had personally sought
from the LFB which suggested that there was a breach of fire safety compartmentation.
The Fire Safety team carried out an inspection of the resident’s flat on 29 June 2017 when it
became clear that the gaps were significant. This raised concerns about the structural
integrity of the block, and the other three tower blocks as well as the fire safety of the
residents.
A new fire risk assessment was carried out on 30 June 2017 and the LFB were informed.
The LFB carried out their own assessment of the tower blocks on the same day which
required the council to put in place a number of remedial measures, all of which were
designed to ensure that residents could remain in their homes during the investigative
surveys and the temporary repairs to seal the breaches in compartmentation. These
included:
* Walking Wardens (one per two floors) hired from a private company to walk the floors
during twelve hour shifts (two shifts per day). This is co-ordinated from Tenants and
Resident Hall (Control Centre) by Southwark Council staff to ensure that the brief is
complied with in full.
* Each block has one person designated to call 999 to inform the Control Centre of any
potential issues. This person has overall control of the wardens in the block. The
instruction to the Wardens is that in the event of a fire anywhere in the block they are
to alert the residents and assist them to leave the block. There is no longer a ‘stay
put’ strategy applied to the estate we are now working to a simultaneous evacuation
strategy. In an emergency, priority will be given to those on the floor of a fire and
initially those on the floors above the fire.
* Communication between all Wardens via radios and between the Control Centre and
the Head Warden and between Head Wardens for each block.
* The maximum distance from a front entry door to the staircase is @six metres and
there are four flats per floor.
* Ongoing work to seal any gaps between flats.