Skip to main content

Content Warning

Archive material discusses fatal building failures and contains potentially distressing elements.
TBUK2234

National Tower Blocks Directory 1992

ARCHIVE DOCUMENT
Not stated
1992

PLANNING FOR PLAY

Jerry Cooper of Theories
Landscapes describes how
tenants – including children –
can improve their estates and
design their own play areas.

Gone are the days of council hand-me-
down landscape designs. There are
countless successful examples of
environmental improvements instigated
and developed by tenants, with the help of
professionals such as Theories.

THEIR RIGHT
We like to involve the children too – e.g.
we believe the young people have the
right to take part in planning gardens and
play areas.

Community-led estate improvements
have been developing for decades.

To complete a community-involved
project is a lot of hard work for everyone
concerned. Success depends on the quality
of the professional help brought in and on
the tenants' own energy, level of
organisation and willingness to bolster,
bully and buoy involvement along. The
process is lengthy, costly and energy
sapping.

Where the estate has youth clubs, play
groups etc. it is relatively easy to plug into
them to get children involved.

CHOOSING A DESIGNER
The tenants' organisation's first task is to
choose an appropriate designer. The local
council planning department can often
advise groups.

Organisations such as ACTAC have a
membership list of groups that actively
promote community involvement (contact
them on 051 708 7607.)

Having chosen a short list of designers,
they will need to be met and a final choice
made. Costs and fees will need to be
discussed. Some groups have funding to
help tenants' organisations, whilst others
will require separate funding to cover the
costs of a feasibility report. Local councils
may help.

The first stage of any project is to carry out
a detailed survey of the whole area where
improvements may be made. All the
positive attributes, as well as the problems,
of a particular site can be highlighted and
discussed.

The most suitable areas to be changed can
then be chosen and the places allocated
where play can take place.

Then it is necessary to decide who the
environmental improvements/play
facilities are designed to serve - what age
groups and in what numbers. Door-to-
door surveys or questionnaires may be
needed.

DIFFERENT GROUPS
The age categories usually chosen are
under fives, 5 to 12, and teens upwards.
The ages are not necessarily exclusive in
terms of play equipment, but each age
group has to be considered.

Questionnaire information and other
responses are collated and fed into the
design process.

Meetings will be necessary so that ideas
can be evaluated. The meetings may
simply be an addition to TA business.

By some stage a hard core of interested
children and adults will have developed
who wish to see how other estates or play
projects have turned out.

As designers we find this useful because
it offers a chance of extending the
repertoire/vocabulary of play choices.

Place a child in a tarmac space, ask what
they want and the result is a shopping list
of play equipment ranging from the slide
to swings. However, if the same child has
been introduced to a wider selection of
possibilities such as adventure gardens;
decorative art projects; or a play area
containing custom-built play features, the
usual answers change because the choices
are wider.

WORKSHOPS
The creative crucible of any project are
the design workshops. With pen and
pencils, plastercene and cardboard cutouts,
wood and glue, paint and felt tips, models
can be made to help represent the ideas
that have been contributed.

It is then the designer's job to develop
these ideas into something practical,
imaginative and engaging to the children.

Running in parallel with all these stages
can be an exhibition of the ideas as they
are produced. A strategic exhibition site
will be useful in ensuring that as many
people as possible are able to keep track of
developments.

Theories' particular expertise includes
landscaping, gardens, play areas and
decorative arts (mosaic/paint, etc.). We
attempt to ensure that every solution is
individual to that place and the people
involved.

By the nature of the way work, the
product is crafted to a high degree, the
elements are custom built and the
enviroments are individualised.

FUNDING
A report is used to achieve adequate
funding for the project. This stage can be
long and fruitless. Many people begin to
mutter about the futility of the process,
and children who were actively involved
move away or get older and lose interest.
But when the Jack Pot comes in all the
excitement begins.

When the project is successfully funded,
site works can begin. The tenant/child
involvement fostered during the design
process can continue to help make the
physical changes.

If a school has been involved, a class can

continuued on next page

NTBN DIRECTORY 151

TBUK2234
234 of 248