National Tower Blocks Network, Annual Spot Safety Survey

REPORT OF INSPECTION CARRIED OUT ON 9th OCTOBER 1990.
Inspection carried out by Sara Gowen of The National Tower
Blocks Network Sheffield.
1.00 INTRODUCTION.
1.01 This report should be read in conjunction with the sketch
plan.
1.02 The block is in relatively good condition. Vandalism is a
problem in other blocks on the estate ie lifts set on fire and
a tenant is alleged to have set fire to a 6th floor flat in
order to get a transfer.
1.03 The block is 15 storeys. There are 8 flats per floor. The
plan is symetrical with a central bay containing a fire stair
and lifts which lead to an internal lobby. This lobby feeds
either side to a lobby running the full width of the block.
This is ventilated. These lobbies lead to two internal lobbies
around which are arranged four flats.
2.00 MEANS OF ESCAPE AND FIRE SAFETY.
2.01 Each flat from the second floor up has two means of
escape. One is via the front door to the escape stair. The
other is via a "kick panel" on the balcony. This leads to the
other flat.
2.02 This secondary means of escape is presumably to comply
with the requirements of BSCP CP3 Chap IV (1971).
2.03 In a number of important respects Spring does not meet the
basic requirements of these regulations.
3.00 THE INSPECTION.
3.01 The inspection started on the top floor and worked down.
3.02 All the fire doors were in order.
3.03 Each of the main lobbies running across the width of the
block had rubbish shutes and caretaker rooms. Some rooms were
locked, others were crammed with rubbish, boxes and old
mattresses. This is a major fire risk. These conditions were
found on floors 1, 2, 3 and 10.
3.04 Each internal lobby has a compressed fibre false ceiling.
This lobby serves the front door of each flat. There are four
to each lobby. (see sketch plan)
3.05 The materials and construction used in this lobby which is
the only means of escape must not support fire. This ceiling
will burn. If there is a fire in a flat this ceiling could
ignite and trap tenants in the other three flats. This should
be treated as a protected corridor. The materials used for
these walls and ceilings should be Class 0.
3.06 Given the risk of fire from the accumulated rubbish in
this block it is not a question of, 'if this happens' but
'when'.
3.07 The false ceiling in the lift lobby at ground level has
the same tiles. This lobby opens into the main lobbies at the
bottom of the block. Each lobby has the same tiles.
3.08 The materials used in these ceilings will support fire.
The block does not comply with BSCP CP3 Chap IV (1971). The
materials used do not comply with the 'surface spread of flame'
requirements of the Building Regulations.
3.09 There are no notices about what to do in the event of
fire. There are no smoke alarms or emergency lighting.
3.10 There is a dry riser running up the centre of the
building. It is not covered. There is an outlet at each floor.
3.11 Lobby windows are broken on floors 12, 13, 14 and 15.
3.12 There is a notice about the dangers of Liquified Petroleum
Gas (LPG) in the caretakers office. This is behind security
glass and not legible.
4.00 CONCLUSIONS.
4.01 This block of flats does not comply with BSCP CP3 Chap Iv
(1971) with respect to surface spread of flame of materials
used in the contrucion of the false ceilings in lobbies. These
lobbies are the escape route from the block.
Sam Webb Architect for the National Tower Blocks Network.