Bison or Bull?

Remedial works are no answer
Proposing remedial work for Bison Flats does not guarantee their future.
Take these examples:-
"It was probable that as work of the pilot studies progressed, the need for
further works would be identified".(Hillingdon)
"There may however be other defects latent which are not at present evident or
dectectable because of the complexity of the construction, and thus no-one can
guarantee that any repair works which may be carried out will be permanent or
final, or that they will not be affected by such existing hidden faults".(Manchester)
The most damning example of what happens when you really investigate Bison comes
from Hillingdon, in 1979 six volumes of reports produced before further investigations
took place. Now look at the difference of the costs involved from building price
rises after the further investigations revealed more defects.
Blocks May '79 Cost '79 Decision April '82 Cost Decision
Birchway £5,900per Dw. Repair £26,880per dw. DEMOLISH
Padcroft £5,470 " " " £23,266 " " "
Field End Road £5470 " " " £29,206 " " "
Yiewsley Gdns. £4,830 " " " £28,062 " " "
Nine Elms £4880 " " " £28,016 " " "
NEVER BELIEVE THAT YOU HAVE FOUND OR CAN SOLVE THE PROBLEMS WITH 'BISON'.
Further:
"The remedial works so far carried out at the insistance of the City Architect, by
the original contractor and his sub-contractor have only had a limited life effect.
They have ultimately proved to be ineffective"(Manchester)
THE VERY SAME IS KNOWN ABOUT NOTTINGHAM.