WESA_5_4_02p1

Sam Webb, Interim Report, Fire at Lakanal, Sceaux Gardens Estate

ARCHIVE DOCUMENT
25 July 2009
Start of document

INTERIM REPORT

Fire at Lakanal

Sceaux Gardens Estate

Camberwell

London Borough of Southwark

On Friday 3rd July 2009

For the Personal Attention of

Sir Kenneth Knight
The Office of the Chief Fire and Rescue Adviser

To

The Rt Hon John Denham MP
The Minister for Communities and Local Government

By

Sam Webb RIBA Chartered Architect
25th July 2009
©

Sam Webb RIBA Chartered Architect
Walnut Tree Cottage
68 Shalmsford Street
Chartham
Canterbury CT4 7RH

[email protected]

01227 738296
077 534 50392

Copyright

---

[REPRODUCTION OF PUBLISHED DRAWINGS]
These drawings are from the Architect's Journal 7th January 1960. The left
hand section shows the original shallow false ceiling in the access corridor.
The scheme was also published in AJ 28th August 1964, Architectural Review
April 1960 and DoE Design Bulletin 25 1972. These can be found in the RIBA
Library 66 Portland Place W1B 1AD 0207 580 5533.

---

Photo 1. Lakanal on the afternoon of Saturday 4th July 2009.

Lakanal is named after Joseph Lakanal 1762-1845 the French Politician and
member of the Institut de France. He was a founder of the modern French
Educational System. He lived for a time in Sceaux near Paris. All the blocks
on the estate are named after notable Frenchmen and women who had
connections with Sceaux.

INTRODUCTION

1. The Sceaux Gardens Estate was the largest postwar redevelopment in
South London when it was completed in 1959.

2. The Estate was designed in 1957 by the Architects Department of the
Borough of Camberwell.

3. The Borough Architect was Frank Hayes OBE ARIBA.

4. The design architect was Hans Trenton ARIBA.

5. On the formation of the London Borough of Southwark Frank Hayes
became the Borough Architect and Hans Trenton joined him as his Deputy.

6. Han Trenton, or Felix Trenton as he was better known was the design
architect for the Aylesbury Estate. Those flats are of different design and
construction.

7. Aylesbury Estate is what is known as a Large Panel System.

8. Sceaux Gardens is an insitu reinforced concrete structure of crosswalls and
floors. It is extremely strong.

9. The design of the flats at Sceaux Gardens is what is known as Crossover
Maisonettes or Scissors Blocks.

10. Each flat is on two floors with 2 bedrooms and a bathroom on the
entrance floor level. Each flat used to have a warm air heater cupboard by the
front door. This forms part of a small ventilated lobby leading to the bathroom
containing the WC. The lobby was required at the time by the London
Constructional By-Laws

11. The warm air heating system has been replaced.

12. When it was replaced it is possible that alterations were made to the false
ceiling in the entrance corridors. These would have effected the fire
compartmentation and added to the fire load in the false ceiling. It appears to
have been made deeper to cover pipework.

13. From the left of the front door a wooden staircase leads up to the living
room. At the top this stair has a series of winders. These turn at right angles
into the living room. There are two stairs at the top.

14. These two timber stairs cut into the junction of the top of the wall and
ceiling of the main access corridor and breach the 1 hour fire
compartmentation of the escape route.

Photo 2. This photograph shows the stairs leading to the living room of 43
Marie Currie in Mr & Mrs Wright's maisonette.

Photo 3. The underside of these wooden stairs have been protected on the
access corridor side by what appears to be an Asbestolux casing.

15. This is the fatal flaw in the original design. The timber stair is only
protected from ONE side.

16. If the fire is within the flat there is nothing to protect the wooden
stairs at the top of the flight.

17. If these timber stairs burn then eventually there will be nothing to
secure the asbestos fireproofing on the underside and this will fall into
the false ceiling.

18. When this happens hot gases of +1000 degrees Centigrade, flames and
fumes etc will travel at considerable speed along the false ceiling which will be
hidden from view until it burns through and causes a flashover.

20. The false ceiling is full of tinder dry old timber framing.

21. An additional plasterboard coving at 45 degrees covers the Asbestolux in
places but not in the photo above. It may have been removed and the ceiling
lowered at a point after completion of the building.

Photo 4. This photograph is taken in the lift lobby area on the 7th floor of Marie
Currie looking south. This timber framing has been added since the block was
first built as a photo of the main corridor in the AJ shows the ceiling at a
higher level with two 45 degree plasterboard chamfers below. AJ 07/01/1960
p 29. It is possible this was done when the heating system was changed.

THE REGULATIONS IN FORCE WHEN THE BLOCK WAS BUILT IN 1957-59

22. In 1957 Camberwell was one of the Inner London Boroughs governed by
the London Building Acts 1930-39 and the London Constructional By-laws.

[REPRODUCTION OF PUBLISHED MATERIAL - Architects' Journal January 7 1960 p.129]

23. The London Building Acts dated back to the Great Fire of London in 1666
and the District Surveyor dates back to the the London Building Act of 1774.

24. Buildings of the height of Lakanal and Marie Currie were also controlled by
Section 20 of the London Buildings (Amendment) Act 1939.

25. This applied to buildings of over 100'0" in height as these were beyond the
reach of the London Fire Brigade ladders.

26. Lakanal is 140'0" high (42.7m), 187'4" long (57m) and 41'0" wide (12.5m).

27. The design would have been approved to "the satisfaction" of the District
Surveyor.

28. The architect would also have had to obtain the approval of the London
Fire Brigade.

29. Both would have insisted on a minimum of a ONE HOUR FIRE
COMPARTMENTATION for each dwelling.

30. This would mean that occupants could safely remain in their
maisonette for up to one hour in safety.

31. When the fire brigade arrived on Friday 3rd July they would have had
no reason not to believe that this was still the case.

SUBSEQUENT REGULATIONS FROM 1959 TO THE PRESENT DAY

32. In 1962 a new Fire Code for the rest of the UK came into force.

33. This was based on s20 and was known as BSCP CP3 Chapter IV: Fire
Precautions in Blocks of Flats & Maisonettes above 80'0" in height (1962).
The Chairman was George Fairweather FRIBA.

34. In 1971 following a series of fires in hotels which led to serious loss of life
the Fire Precautions Act 1971 came into force.

35. Section 3 of the Act was entitled: "Power of fire authority to make fire
certificate compulsory for use of certain premises as a dwelling".

36. This act divided buildings into classes and in Section 3 would have
covered the Sceaux Gardens Estate but it was never enacted.

37. In 1972 BSCP CP3 Chapter IV: Fire Precautions in Blocks of Flats &
Maisonettes above 3 storeys in height (1972) came into force repealing the
1962 version for new building or alterations.

38. [illegible text]

39. The Fire Precautions (Premises) Regulations [illegible text]

40. [illegible text]

41. Although the FSG covers common areas of blocks [illegible text]
cover fire into themselves.

42. Common areas are main access balconies, lifts, stairwells, boiler rooms and stores etc.

43. [illegible text] being provided by the Management Regulations (Regulations 2007 Community K[illegible]).

44. The report, as does the FSG, the building owner [illegible text].

45. All the recent refurbishments should have been [illegible text].

THE FIRE

46. The fire broke out in a flat on the 9th floor at about 4pm on
Friday 3rd July 2009. (Even[illegible])

47. The brigade were called at 4.19pm.

48. The source of the outbreak was a TV set.

49. [illegible text]

50. [illegible text] what is of crucial importance is why the fire went both UP the building
and DOWN the outside of the block.

51. The fire on the 9th floor spread to the 25th [illegible]. Catherine Hickman a 47 year old
[illegible text]

52. [illegible text]

53. Catherine Hickman became trapped in one of the [illegible text]. She was alone in the flat.

Photo: Catherine Hickman

Photo 5 [illegible text]

Photo 6

53. The fire moved along the 11th floor corridor to flat 81 trapping 9 people
who were sheltering in the small bathroom.

54. These were Helen Udoaka 31 her 3 week old baby Michelle, Dayana
Francisquini 26 and her two children Felipe aged 3 and his sister Thais aged
6. Also in the bathroom was Mr & Mrs Nuhu and their two children.

Photo: Michelle Udoaka

Photo: Rafael with his wife Dayana 26 and two children.

55. Rafael spoke to his wife and children on her mobile from the street. They
all died.

56. Also in the bathroom with them was Rasheed Nuhu, his wife Fatima and
children Miriam 3 and Yashima a baby of 18 months.

57. Mr Nuhu left the bathroom and went upstairs in the maisonette and onto
the escape balcony which runs along the full length of the block and links to
the stair and lifts. This was away from the fire.

58. He had taken with him some curtains which he tied together in order to
climb down the outside of the block but people in the street shouted that he
should not do that.

59. There was a fire appliance with a turntable ladder in the street below.

60. This ladder could not reach beyond the 8th floor.

61. He appears to have gone back into the bathroom and suggested that
everyone should leave but Helen Udoaka and Dayana Francisqini decided to
stay with their children.

62. He took his family out but was unable to get to the fire stairs and did not
reach the firemen because of the ferocity of the fire until one and a half hours
later.

63. He told the firemen about the 5 people still in the bathroom.

64. When the firemen reached the bathroom everyone was dead.

65. In all 3 young women and 3 children died.

66. Had they followed Mr Nuhu they could have survived.

THE RECENT REFURBISHMENT

67. Two years ago under the Decent Homes Improvement Programme the
London Borough of Southwark carried out refurbishment of Lakanal.

68. The block known as Colbert was also refurbished.

69. A new façade was provided to both.

70. These façade panels span from floor slab to floor slab and crosswall to
crosswall.

71. They are of composite construction with what appears to be powder
coated aluminium frames, some form of UPVC frame and some form of UPVC
spandrel panels.

72. In the fire parts of these window units burned and buckled adding to the
fire load and aiding the spread of the fire up the building.

73. There are a number of videos which show this.

Photo 9. This photograph shows buckled metal framing of the windows in the
flat on the 5th floor. Part of the spandrel panel below the windows has been
partially burned away in the fire. See photo 1 on page 3.

HOW THE FIRE DEVELOPED

74. It doesn't matter what caused the fire, whether or not as reported it
was a ten year old faulty TV. That's irrelevant. It could have been a
discarded cigarette, an accident on a stove, a carelessly left candle or
anything else that could cause a fire including arson.

75. It is not what caused the fire but the way and speed with which it
developed that should be considered. It took the fire brigade by
complete surprise both in the way it went up and DOWN the building.

76. I believe three things were responsible for this.

77. The materials used in the refurbishment of the facade.

78. Parts of the original design and materials used.

79. The creation of a NEW false ceiling in the escape corridor to hide
pipework. This probably happened when the warm air heating system
was removed from each flat.

80. The panels which form the new facade span from crosswall to crosswall
and floor to ceiling. They are of composite construction with powder coated
metal frames and what appears to be UPVC frames and infill. These have
been fitted to other blocks on the estate and these facades go down to ground
level. It is possible to inspect them at close quarters. Colbert

81. The UPVC aided the spread of the fire and in various videos
including the 30 minute one it is possible to see the UPVC burning. I am
surprised that such a material was approved for use in such large
quantities on the facade of a building. The original spandrel panels were
aluminium with a backing of plasterboard. These would not support
flame spread.

http://www.nce.co.uk/video/watch-home-video-footage-of-the-camberwell-
fire/5204665.article

82. The original design leaves a great deal to be desired. Each flat has a
timber stair and this has a dogleg with winders. The top of the stair cuts
through the top of the junction of the RC wall and ceiling to the main
access corridor on every other floor. This happens 96 times in each block.
The underside of the stair is protected with asbestos panels. This was a
"deemed to satisfy" material in the London Constructional By-laws.

83. The original design had a 45 degree plasterboard chamfered cove to the
Asbestolux casing and this has been removed in places when the false ceiling
has been dropped to incorporate heating pipes.

84. This timber stair is a major design flaw. If the upper wooden parts
burn away, as they did then the asbestos has nothing to hold it in place
and it will fall into the false ceiling void. With it will go a enormous
amount of heat and superheated air. The carcasing of the supporting
framework for the false ceiling is wood which is bone dry after being in
place for many years. There is what appears to be flammable insulation
to the pipes in this duct, plastic casing to wiring and whatever the
firebrigade removed because they felt it was a fire risk including all the
ceiling panels.

85. All of this amounted to an enormous fireload in a corridor which is
the main fire escape for the people in the building.

86. This is unacceptable in an escape route.

87. Once the fire broke into the space above the ceiling in this corridor it
would behave exactly like the fire under the escalator from the Piccadilly Line
at King's Cross tube in 1987.

88. It was hidden from view and the space's shape and length would cause it
to act like a horizontal chimney. At a certain point there would be what is
termed flashover and a fireball would ensue.

89. That happened at Kings Cross in 1987 and it happened in Summerland in
the Isle of Man in 1973. In that dreadful fire the fire raged in a void between
external metal cladding and a flammable internal wall boarding which
suddenly exploded in a fire ball which killed 50 people and set fire to the
Oroglas walls and roof.

90. A similar situation happened in the main corridor of Lakanal House and
this can be clearly seen on one of the videos as the fireball explodes out of
the window and blasts the louvres into the street. Tony Bird and I picked up
what remained of the metal cores of those louvres in the street the day after
the fire on Saturday 4th July.

http://www.youtube.com/watch?v=-0Bwr9BCGeQ

91. Even if the facade had not been replaced with composite panels of
UPVC and powder coated metal frames the situation I have described in
(84) could still have happened.

92. There are a number of vertical ducts in the block. One of these is shown
on the plan in the AJ Jan 7th 1960 p29 but we were shown another one which
forms part of the bathroom wall by Mr Wright in 43 Colbert.      COLBERT

93. This duct doesn't appear on the AJ drawings. It is possible and I think
highly probable that the fire travelled internally down these ducts and this
rather than burning things falling out of windows may have been a
contributory factor in causing the lower flat fires. This is what has happened
in other fires in blocks of flats I have experience with.

94. It is very difficult to fire-stop pipes and services where they pass through
floors unless they pass through pre-cast holes.

95. For this reason it is normal to make the walls of the duct 1 hour or what
ever the fire rating is required for the building.

96. The shape and size of the duct can often make it difficult to make
connections to services.

97. Ducts in commercial buildings are larger than ducts in domestic premises
in blocks of flats where space is at a premium.

98. These ducts become a critical factor in the design of the fire rating which
while it may be taken into account in the original design can become forgotten
as years pass and alterations are made.

99. I believe this is what happened with the false ceiling in the access
corridor.

100. This does not excuse what appears to have occurred as such actions will
jeopardize the safety of everyone in the building if a fire breaks out.

101. I was not able to investigate the construction of the enclosing walls of
these ducts.

102. It is possible that the construction of these ducts in the flat wall fall below
1 hour and they may have become the way the fire spread to the lower floors.

103. This was certainly the way the fire spread in Merry Hill Court Smethwick
Friday July 13th 1990 when a tenant died and firemen were trapped when the
fire broke out below them when they went to rescue Jennifer Noble.

104. We were also shown the three means of escape, two along a narrow
external corridors approx 600mm wide which run to the fire stair and one from
a bedroom to the main corridor. People are concerned at break-ins through
these doors. Mr Wright was using his as a cupboard.

105. There also appears to be some kind of vent into the escape corridor from
inside the flat which may have had something to do with the old ducted hot air
system but I couldn't quite discover what it was for.

106. This vent could also breach the fire rating.

107. These buildings fall FAR below the standard I would have expected
for fire safety and some of the standards of workmanship are very poor
when you consider the importance of this fire protection and how many
innocent lives it puts at risk.

HISTORY OF FIRE PROTECTION IN LONDON

108. In 1189 a Building Act was passed after the burning down of London
Bridge to create Party Walls. These were fire stop walls designed to prevent
fire passing from one owner's property to an adjoining owner's property.

109. The Great Fire of London 1666 led to the First Rebuilding Act 1667.

110. This was the First London Building Act and these were to stay in
operation until the abolition of the GLC by Margaret Thatcher in 1986.

111. The object of this first Act, not unnaturally, was the prevention of the
spread of fire.

112. As a Royal Commissioner Christopher Wren created an Act working with
Hugh May and Roger Platt as the other two Commissioners.

113. Four surveyors were appointed, Robert Hooke (of Hooke's Law fame),
Peter Mills, Edward Jermyn and John Oliver.

114. Although this Act did not prevent fires anymore than the 12C one did it
led to a culture of fire safety in the design of buildings in London.

115. It could hardly do otherwise after the Great Fire had destroyed London
as it then stood.

116. In 1707 a new Act was passed which ordered each parish to keep a fire
engine and prohibited overhanging eaves and cornices to prevent fire spread.

117. Walls of houses were to be carried a minimum of 18" or 6 brick courses
as parapets above the roof and windows were to be set back 4" or the width
of a brick. This gave the familiar façade seen in London of windows recessed
in the façade which became known as Georgian Architecture.

118. A number of other Acts followed and in 1724 the Act required that notice
be given to the adjoining owner of intention to rebuild a Party Wall. This is still
the law.

119. In 1774 the next major London Building Act was passed following the
Great Fire. It repealed Wren's 1667 Act.

120. This 1774 Act set up the modern DS system which lasted until 1986 and
the abolition of the GLC.

121. It required Party Walls to extend above the roof between buildings.

122. In 1791 a number of leading architects formed a club and in 1792 Henry
Holland, who considered the 1774 act to be, "insufficient, unintelligible and the
source of perpetual contention", arranged for two houses in Hans Place to be
put in the way of the club for fire tests.

123. In 1792 a committee was appointed to see whether a "practical and not
expensive means might be devised which will confine a fire to one room
of a house".

124. The committee wanted to know the causes of fire and the best way of
preventing fires.

125. Their research led them to conclude that:

126. It was profitable to burn down property and claim the insurance,

127. Badly fixed grates, fires and poorly constructed chimneys caused fires,
and;

128. The third was the free passage of air behind wainscot linings and
battenings and the easy access for fire to pass from one storey to another
through floors and up wooden staircases.

129. In other words "unstopped voids" which is what happened in
Summerland 1973, Kings Cross 1987, Merry Hill Court 1991 and in the false
ceiling in the main corridor of Lakanal on 3rd July 2009.

130. Nothing is new in fire studies.

131. Two men came forward with winning solutions, the MP David Hartley and
Charles the Third Earl of Stanhope.

132. Both men sat out huge fires which raged under their feet so to speak.
They felt confidence in their systems both of which worked and they survived.

133. Stanhope's Stucco became widely used, it was simple and required little
skill. Also adopted was his idea of providing a ventilated and fire proof form of
pugging between floor joists which together with plastered walls and ceilings
gave adequate protection.

134. In the early 1970s Bath Fire Brigade carried out a test like this using
Stanhope's methods which was entirely successful although no people were
present.

THE FIRE TEST AT RONAN POINT 18TH JULY 1984

135. In October 1983 I discovered a serious defect in the fire
compartmentation of Ronan Point a 22 storey large panel system block which
had partially collapsed in 1968 following a relatively minor gas explosion. The
chair of the Housing Committee Cllr Fred Jones appointed me to advise him,
the tenants and Nigel Spearing MP for Newham South on Ronan Point.

136. This fault is to be found in many LPS blocks in the UK.

137. It occurs where the external non-loadbearing panel abuts the longspan of
the floor slab. The panel hangs off the ends of the crosswall panels and due
to solar gain will expand in length and bow outwards opening a gap between
the inside of the panel and the edge of the floor slab. See photo 10.

138. A fireproof skirting and coving was designed which I had doubts would
work in practice even though it was to be tested to BS 476 at Warrington by
the Fire Research Station and Building Research Establishment.

139. The samples tested passed BS 476.

140. Skirtings and covings to the same design were installed in a flat on the
3rd floor and at my request all joints were monitored for movement as I
believed a simple domestic fire could have led to the collapse of Ronan Point.

141. Others were more confident and they occupied the floor above the fire
room.

142. After between 10 and 12 minutes the fire was extinguished due to the
considerable movement of the structure and particularly the critical flankwall
joint or H2 as it was known.

143. When asked on BBC Newsnight why the fire was stopped after such a
short time when it should have lasted at least 3 times as long if not one hour
the engineer from Newham who was in charge said that, "I didn't want to be
responsible for a second collapse of Ronan Point." August 1984.

144. I had suggested to the engineer and others with him at a public meeting
at Newham Town Hall that the tenants would only accept it if the experts took
a leaf out of the book of Charles Third Earl of Stanhope. After all one of them
went on record as saying he would feel perfectly safe to let his daughter and
grandchild live in one of the flats in a fire. Then a tenant in Ronan Point said,
"Well why don't you do it in a fire to show us how safe it is."

145. Ronan Point was demolished.

146. There are blocks like this with similar design details in Southwark most
notably the Aylesbury Estate.

Photo 10. This shows the inside of the non-loadbearing face panel in the living
rooms at Ronan Point which just butted along the edge of the floor panel. This
bowed in solar gain and caused a breakdown in the fire compartmentation.

WORKMANSHIP

147. Achieving good standards of workmanship is the key to ensuring that fire
compartmentation is secure in a block of flats as complex as Lakanal.

148. It is not easy to achieve and it is my opinion that the wording of the
Standard Form of Contract may hinder rather than help this situation.

149. When a client decides on a new building they will engage an architect
and they enter a contract.

150. When a contractor submits a tender and it is accepted, a Standard Form
of Contract is signed by the building owner and the contractor and thus
another contract is entered into.

151. At the end of the contract a Final Certificate is issued and if it is not
challenged within a specified time it becomes final and binding.

152. The contract between contractor and building owner ceases to exist.

153. The only contract which remains is the one between the building owner
and the architect.

154. If anything then goes wrong the architect is often held to blame rather
than the contractor on the grounds of lack of supervision.

155. In order to get out of this Catch 22 situation the architect has to prove the
defects were latent defects that is ones that were hidden. The contractor will
argue they were a patent defect and any architect should have seen the
defective work and stopped it.

156. All of that happened in the case of East Ham v Bernard Sunley 1966
which swayed first one way then another until finally on a split decision the
House of Lords ruled the contractor was responsible for the bad
workmanship.

157. Such a situation is not in the public interest. It is not in the Client's
interest and it can certainly jeopardise safety.

158. It is doubtful if the East Ham case would even get to court under the
present contract.

159. When Ronan Point was scientifically dismantled not one single joint in
the building was found to correspond with the detailed drawings. The public
inquiry picked some of this up but never on the scale I found. If it had it would
have ordered Ronan Point's demolition in 1968.

160. I was able to date the bad workmanship by the dates on the newspapers
stuffed into structural joints both during the original construction and during
the repair work after the public inquiry.

161. If the Final Certificate had been issued before the progressive collapse
what would have been the position of the architect?

162. Who was really responsible for stuffing newspapers and cement bags
into joints where structural concrete should have gone?

163. Was it the architect's responsibility or was it the contractor's?

164. That sort of bad workmanship can happen in respect of fire stopping in
ducts.

165. In Merryfield Court the fire stopping between floors and where pipes
passed through floors was newspapers stuffed into the gaps.

166. Why does this happen?

167. Because of the wording of the contract I believe some contractors hope
to get away with it and hope nothing will come to light until after the Final
Certificate is issued.

168. The public deserve better. They have every right to expect the buildings
they enter are safe.

CONCLUSIONS

169. The fact that the fire occurred due to a faulty TV is irrelevant.

170. Many things from a discarded cigarette, an accident with a cooker such
as a chip pan fire or a carelessly placed candle are only 3 common or garden
causes of fires. There are many others.

171. Fires can also be started deliberately.

172. Any of the above will have produced the same result in Lakanal on the
afternoon of Friday 3rd July 2009.

173. The materials of the façade appear to have aided the spread of the fire.

174. Was that ever considered in the design?

175. Was this considered under the CDM Regulations?

176. The fire spread upwards to upper storeys and downwards to lower
storeys.

177. Spreading downwards is unusual. From the 30 minute video in para 81 it
appears the lower fires started inside the flats.

178. I believe the pathway for that spread was down the two service ducts.
One in the wall by the stair and escape route from the main bedroom. The
other down the duct in the bathroom.

179. It is unlikely these ducts really had one hour fire protection.

180. Once the fire became established the temperature would quickly rise to
1000 degrees C.

181. The timber stair would burn fiercely and the two top steps would burn
through with the result that the Asbestolux on the other side would fall into the
false ceiling in the access corridor.

182. Once this happened the material in the false ceiling would burn until
flashover occurred and the entire false ceiling for the entire length of the
corridor would explode in a fireball.

183. That can be seen happening in the shorter video in para 90.

184. At some point in the life of Lakanal and Marie Currie a new heating
system was installed and the false ceiling lowered.

185. Who made that decision?

186. Who designed that false ceiling?

187. Do any drawings exist?

188. Who approved the work under s20 of the London Building Acts?

189. I find it hard to understand how a District Surveyor could approve such
details given the vast increase in the fire load in such a critical part of the
building namely the main access corridor to the flats on every floor.

190. Or was it just done with no real quality control in some kind of ad hoc
manner?

191. Perhaps it never was approved.

192. Why is it important to discover this now perhaps many years after the
work was done?

193. It is important because this was the major cause of the rapid
internal spread of this fire.

194. It was this rapid fire spread which prevented the escape of the 6 people
and prevented the Fire Brigade reaching them once a certain point in the fire's
development had been reached.

195. Since Lakanal and Marie Currie and possibly other blocks elsewhere
were built requirements have changed on the length of escape runs in what is
known as a "dead-end corridor".

196. With this in mind it may prove necessary to build new fire stairs in such
circumstances.

197. If this is done then great consideration must be given to the security of
the block to prevent entry by unauthorised persons.

198. If it proves impossible to provide extra stairs then consideration should
be given to the life of the blocks.

199. It is important that people who live in such large blocks of flats are given
training in what to do in a fire.

200. It would be unthinkable not to do that in a place of work because it would
be against the law not to have fire drills on a regular basis.

201. As fire brigade ladders do not reach above the 8th floor and these blocks
appear to have had no hardstanding to get the ladders near enough, should
other possible escape mechanisms be considered?

202. There was a helicopter overhead directing the firemen.

203. There are air sea rescue helicopters on the Thames and at Manston.
They could have rescued Mr Nuhu and his family. If they had got there soon
enough they could have led at least 5 of the people to safety who were in the
bathroom and possibly Catherine Hickman who was on her own in her flat
next door.

204. There appears to be no definitive list of tall residential blocks of flats in
the UK.

205. Many of these have changed ownership since they were built and it is
possible original records have been lost so the methods of construction are
not always clear.

206. This is particularly important in respect of Large Panel System buildings
subject to progressive collapse.

207. Is enough really known about design and fire by architects, builders and
other people in the building industry?

208. In 1991 the Home Office and Department of the Environment produced a
report on a core curriculum in fire studies entitled Fire Studies by Design.

209. It was aimed at everyone in the building industry who designed buildings.

210. What happened to all the hard work which went into producing that
report or was there no money to implement it?

211. I took part in that exercise at the Home Office Fire Service College at
Moreton-in-Marsh in late 1990 and I never heard anything more after the
report was produced.

212. The only response from the Home Office was a reply to my query as to
why s3 of the Fire precautions Act 1971 could not be implemented for blocks
of flats.

213. Frances Clarke of Community Links and I formed the National Tower
Blocks Network. Our research showed that just over 50% of the blocks we
received returns from failed to meet basic fire safety standards.

214. The answer from the Home Office in 1991 was that to enact s3 would
render many people homeless.

215. I didn't believe that then and I don't now.

216. On Thursday 13th July 2006 a very serious fire occurred in a block of flats
under construction on the Graham Park Estate on the old Hendon Aerodrome
site. This building was of timber frame construction.

http://news.bbc.co.uk/1/hi/england/london/5173808.stm

217. Hendon Police Training College, a police station, a student halls of
residence and a number of homes near the fire were evacuated. In all 2,500
people were moved to safety.

218. It took 5 hours to bring the fire under control.

219. Buildings other than the one involved were badly damaged including a
hall of residence.

220. In the light of this fire and what happened at Lakanal and the form of
construction used consideration should be given as to whether this is a safe
form of multi storey construction for housing.

RECOMMENDATIONS

1. At the end of a contract and before the issue of the Final Certificate by the
Architect (the Designer under the CDM Regulations) the Principal Contractor
under the CDM Regulations is to confirm in writing that the building or the
works to any building have been built in accordance with the approved plans
and relevant Building Regulations, Codes of Practice and Health & Safety
Legislation.

2. The CDM Regulations should be amended to incorporate this change and
any other changes deemed necessary as a result of this fire disaster.

3. The Final certificate cannot be issued until this written confirmation has
been received by the Designer (Architect) under the CDM Regulations.

4. The Standard Forms of Contract should be amended to incorporate this
change.

5. The Regulatory Reform (Fire Safety) Order 2005 (FSO) should be amended
and extended to incorporate blocks of flats and maisonettes above 3 storeys
as was originally intended when s3 of the Fire Precautions Act 1971 was
drafted.

6. During construction Building Inspections should be conducted formally and
precisely both by the Architect (the Designer under CDM) and the Building
Control Officer and recorded in writing by the Principal Contractor that the
building is being constructed in accordance with the approved plans, relevant
Building Regulations and Codes.

7. Residents in flats and maisonettes above 3 storeys are to be given
instructions in means of escape and fire drills are to be carried out at least
once a year by the local fire brigade depending on the height and risk in the
building.

8. All escape routes are to be clearly marked and illuminated with emergency
lighting and floors clearly numbered.

9. Dry riser connections are to be made secure on every floor so they cannot
be vandalised. The ones in Marie Currie appear adequate in this respect.

10. Smoke alarms are to be fitted inside flats and in escape routes.
Depending on the risk these should be connected to the local brigade as is
the case with hospitals etc.

11. Where work occurs to the external facades of any block of flats above 5
storeys in height then both sides of the materials used must be rated Class O.

12. Any voids in facades must be adequately fire stopped where necessary.

13. Where work occurs to existing internal means of escape routes then both
sides of all the materials used must be Class O.

14. There is a basic inbuilt weakness in the fire worthiness of Lakanal and
Marrie Currie. It may occur in other tall residential buildings. Where the
internal timber stair crosses the line of the wall and ceiling junction of the main
escape/access corridor it is only protected on one side. The side to the flat is
unprotected yet the fire is most likely to break out in the flat.

15. Where blocks of flats and maisonettes are higher than the fire brigade
ladders then consideration should be given to the installation of a sprinkler
system.

16. Architectural Education and the education and training of everyone in the
building industry who designs buildings or their components should include a
much extended study of fire protection and precautions.

17. Consideration should be given to alternative means of rescue from tall
buildings beyond the reach of fire brigade ladders such as trained crews
operating from helicopters.

18. Reconsideration should be given to the use of multi storey timber frames
for housing in the light of what happened at the old Hendon Aerodrome
development and at Lakanal.

19. Perhaps it is worth remembering that the Building Regulations, Codes of
Practice and the Regulatory Reform (Fire Safety) Order 2005 are only
minimum requirements for public safety.

Sam Webb RIBA

Date: 28th July 2009.

FILE: Interim Report FIRE 1.docx/Camberwell Fire 03/07/09

==============

==============================
ARCHIVE_FOLDER: WESA:5:4
DOCUMENT_ID: WESA_5_4_03
DATE: Unknown
PLACE: Not stated
------------------------------

WeSa/5/4 ②

SAM WEBB
SCEAUX GARDENS ESTATE

REPORT OF A VISIT
TO MARIE CURIE
JULY 2009

[Sticky note:] FROM BOX 8

==============

==============================
ARCHIVE_FOLDER: WESA:5:4
DOCUMENT_ID: WESA_5_4_04
DATE: Friday 31st July 2009
PLACE: Marie Currie Sceaux Gardens Estate
------------------------------

REPORT OF A VISIT TO MARIE CURRIE SCEAUX GARDENS ESTATE
Friday 31st July 2009 from 3pm to 5.30pm.

1. A visit was made to Marie Currie at the request of the Ward
Councillor Cllr Ian Wingfield.

2. Those present at the meeting were Cllr Wingfield, Tony Bird an
Independent Housing Adviser and Mike Baker from the Tenant's
Association. We were also joined by Mark Warlidge of Morrisons, his
forewoman and the foreman from Lakanal for a short period outside
Marie Currie.

3. We visited all floors of Marie Currie by walking up and down the main
staircase.

4. This report is being sent to Cllr Wingfield and the TA.

5. Tony Bird and I previously visited the estate the day after the fire
on Saturday 4th July and again on Thursday 23rd July when Tony and I
were taken round Marie Currie by Mike Baker who is a member of the
TA and we visited flat 43.

THE OUTBREAK OF FIRE & WEAKNESSES IN THE 1 HOUR FIRE
PROTECTION

6. The fire stated in the main bedroom of a flat on the 9th floor. This
bedroom was immediately adjacent to the main escape stair.

7. It is believed to have been caused by a short circuit in a TV.

8. It is irrelevant as to what caused this fire. The important issue is
why did it spread so fast up and down the building.

9. Was there anything in the original design or subsequent alterations,
whenever these were carried out, which would lead to the rapid
development of the fire?

10. The fire spread rapidly up the façade of the building. The façade
caught alight and added to the rapid spread of the fire.

11. The fire spread up the building to the main bedroom in flat 79 on
the 11th floor.

12. There are two Videos which show the development of the fire.

Video A http://www.youtube.com/watch?v=-0Bwr9BCGeQ

Video B http://www.nce.co.uk/video/watch-home-von%20the%2011th%20floor%20-footage-of-the-camberwell-fire/5204665.article

13. At the beginning of Video B, which is from Channel 4 News and on
the New Civil Engineer website, the fire can be seen burning fiercely on
the East Elevation in the living room of flat 79 on the 11th floor. This
would have prevented anyone escaping along the access balcony to
the central stair.

14. It was a hot day and if the door to the main bedroom in flat 79 had
been open to get a through draught up the internal stair to the living
room then this would provide a ready passage for the fire to spread.

15. This fire would ignite the timber stair which would burn through
especially at the top where it crosses over the junction of the ceiling
and wall of the main access/escape corridor.

16. The fireproofing which was on the corridor side would fall off into
the timber false ceiling and this would quickly ignite reaching
temperatures of 1000C. This would produce flashover and a fireball.

17. The effects of this can be seen at the beginning of Video A and
after about +17mins into Video B where the intensity of the fire in flat
79 grows more intense having previously died down.

18. Some minutes before this on Video B there appears to be steam
coming out of the room at the seat of the fire on the 9th floor which
would indicate that the fire brigade were on that floor and putting the
fire out.

19. Once the timber false ceiling caught fire on the floor above this the
fire brigade had no option but to withdraw.

20. How did the fire get into the corridor?

21. Lakanal and Marie Currie would have been Section 20 (s20)
buildings under the London Building Acts (Amendment) Act 1939 as
they were over 100'0" high. Today s20 applies to buildings over 30m
high.

22. This would mean that the construction of the building would have
to be able to resist the action of fire for at least 1 hour and that each
flat and the escape corridor etc would each be 1 hour fire
compartments.

23. The timber stair was only protected on its underside where it
turned at right angles at the top and crossed into the living room
above the bedrooms.

24. This stair cut right through the fire compartment. Once the timber
stair burned through and the top fell into the timber false ceiling, flat
79 on the 11th floor was united with a corridor 57m (187'4") long with
no horizontal fire stopping at all.

25. The fire in the false ceiling would produce a dramatic increase in
pressure and this would force the fire back into flat 79 and fumes into
the next door flat 81. This fire coming back into flat 79 can clearly be
seen on Video B after about +17mins.

26. Above the main entrance door to each flat is a ply fanlight which
was inside the false ceiling. If this had burned through it could have led
to fire spread within the false ceiling.

27. The fire also spread down the building to the bedrooms of flats on
the 7th and 5th floors.

28. This is very unusual in a fire.

29. This downwards fire spread could have been caused by burning
debris being blown into open windows or via unstopped voids in
vertical ducts carrying services.

FALSE CEILING IN CORRIDOR

30. The false ceiling in the main escape corridors on every other floor
in Marie Currie and Lakanal was replaced and the level dropped
sometime in the late 1980s to incorporate and hide the new heating
mains when the heating system was changed.

31. I spoke to the foreman in charge of Lakanal and he said he thought
it was done in 1987 or thereabouts.

32. I am unable to understand how a GLC District Surveyor, a post that
lasted until 1986 when the GLC was abolished, could possibly have
approved the false ceiling as constructed.

33. The office of District Surveyor continued after 1986 and he would
still be responsible for s20 buildings.

34. The false ceiling was a material alteration to the building and as
such required approval under s20 (Section 20) of the London Building
Acts (Amendment Act) 1939. This was the sole responsibility of the
District Surveyor. He was personally responsible and the work had to
be to his "satisfaction".

35. S20 has this to say about false ceilings:

5.19 False Ceilings: Consent will be required for false ceilings which
should be of incombustible construction.

From LCC Construction of Buildings in London 1957 p235.

36. This was a 279 page book which contained all the relevant parts of
the London Building Acts and By-laws for Inner London including s20. It
was used by everyone who worked in construction in Inner London.

37. It contains a list of all the District Surveyors and the one for
Camberwell in 1957 was Mr R.H.King whose office was at 49 Rye Lane,
SE15.

38. The requirements for false ceilings have not changed and the same
requirement would have been in force in 1987.

39. The false ceiling installed about 1987 was far from incombustible .
Incombustible is designated by Class O materials.

40. The access corridor is the only access corridor leading to the main
single staircase. It is a fire escape and as such should have been Class
O construction. Class O will not support the spread of fire.

  • Who designed this false ceiling?

  • Did anyone ever approve the construction of this false ceiling
under s20?

  • If not why not?

41. This false ceiling was the major cause of the rapid fire spread
inside the building. Even without the recent re-cladding of the façade
there could have been an equally disastrous fire. Only luck has
prevented that happening in the past.

42. Internally there are a number of paths for the passage of fire. The
obvious one on Friday 3rd July was when the fire burned through the
top steps of the internal timber staircase in flat 69 on the 11th floor
nearest the main staircase and lift. This was the flat immediately above
the one in which the fire broke out on the 9th floor.

43. When that happened whatever was protecting the false ceiling side
of this timber stair fell away into the false ceiling as the fire burned
through the top steps.

44. Originally I believe this protection to have been asbestos but I
believe that was replaced on health and safety grounds when the new
false ceiling was constructed. Asbestos was widely used as a fire
proofing when this building was designed and constructed 1957-59. It
was a "deemed to satisfy" material under the London Constructional
By-laws and would have met the requirements of s20.

45. The timber staircase was likely to have been protected originally
by what would have been covered by an earlier version of Table B(1)
Constructional By-laws (GLC) 1973. This allowed asbestos and or
gypsum plasterboard. When this was removed c1987 some safer
material than asbestos such as "Supalux" would have been substituted.

46. "Supalux" was first introduced into the building industry just over
30 years ago as a safe replacement for asbestos.

47. If the protection to the top of the timber stairs had been the two
layers of gypsum plasterboard allowed under the LCC By-Laws then
there would have been no need to remove it and replace it when the
false ceiling was lowered.

48. It would only have been removed and replaced on health grounds.

49. As the fire protection fell away the pressure generated inside the
flat by the fire forced a wall of superheated air of at least 1000C into
the cavity above the false ceiling. With the considerable fire-load of
bone dry timber in the ceiling cavity it would only be a matter of
minutes before flashover occurred sending a fireball along the corridor
and out through the window at the end overlooking Dalwood Street.
This can be seen happening on Video A

http://www.youtube.com/watch?v=-0Bwr9BCGeQ

50. There is a longer Video B which shows the development of the fire.
The first shots are of the East Elevation and are of the flat next to the
main staircase on the 9th floor. At one point on the West Elevation the
fire in this flat and the one above on the 11th floor appears to die down
(13 mins) then some minutes later it comes back into both flats. By
+17 mins on the video there is a huge fire in both flats and in two
lower down. These all get bigger.

http://www.nce.co.uk/video/watch-home-von the 11th floor -footage-of-the-camberwell-fire/5204665.article

51. Why did the fire appear to die down and get bigger and fiercer
when the fire brigade would have been expected to have been able to
bring it under control?

52. When flashover occurred it would have forced the fire back into
the flat beside the main stair and the one next door which had 5
people sheltering in the bathroom. As well as going along the corridor
and into the flank wall above the street through the louvres which it
blew clean out of the building the fire went through into the lift lobby
and fire stairs where the brigade were. They had no alternative but to
withdraw.

53. What is seen on Video B after approx +17 mins is the flames from
the corridor ceiling burning and reaching the outside of the building on
the West Elevation. The flames in this combustion are coming from the
timber in the false ceiling.

VERTICAL SERVICE DUCTS

54. The next question is how did the fire spread down the building. Fire
is expected to go up buildings because heat rises but this one set fire
to flats on the 5th and 7th floors. How could it do this?

55. There are a number of vertical service ducts in the building which
serve the flats. Tony Bird and I have found clear evidence of a total
lack of fire stopping at floor level in one of the two ducts we inspected
in the lift lobby of the main corridor. These faults in this duct occurred
on every floor we inspected. We inspected the duct for the full height
of the building on each floor.

56. Both of these ducts are in the area of the lift lobby and beside the
double doors. These doors may once have been fire escape doors but
today while having door closers the top half of each door consists of a
perforated metal screen which allows an airflow from end to end of the
building and through the full height of the lift shaft. This mesh will also
allow a fire to pass through. There appears to be no adequate fire
stopping above the door head although it might once have been there.

57. There is no horizontal fire stopping in Marie Currie in the length of
this corridor. The total length of this corridor is 57m (187'4").

DEAD END CORRIDORS

58. A dead end corridor is one in which there is only one route for
means of escape.

59. There is one stair in the block for means of escape.

60. The northern part of the corridor is approximately 23m (72'0")
long.

61. The southern part is 29.25m (96'0") long.

62. The escape corridors in Marie Currie and Lakanal are dead end
corridors.

63. While permitted in 1957 an escape corridor of this length for this
type of building would not be permitted today.

64. There is no horizontal fire stopping in this corridor today.

65. The general principle to be followed when designing facilities for
means of escape is that any person confronted by an outbreak of fire
within a building can turn away from it and make a safe escape in the
opposite direction.

66. The assumption in the current Building Regulations (Approved
Document B) is that reliance should not be placed on external rescue.
(B1. (i))

B1.vii states: There is always the possibility of the path of a single
escape route being rendered impassable by fire, smoke or fumes.
Ideally therefore people should be able to turn their backs on a fire
wherever it occurs and travel away from it to a final exit or protected
escape route leading to a place of safety. However in certain
conditions a single direction of escape (a dead end) can be accepted
as providing reasonable safety. These conditions depend on the use,
size and height of the building and its associated fire risk, the size and
height of the building, the extent of the dead end and the numbers of
persons accommodated within the dead end.

67. In effect this means that, in theory, it is safer to stay in your flat
and your flat should have at least a 1hour fire protection.

68. When the fire brigade arrived they thought they were coming to a
building which would meet the 1 hour criteria.

69. Lakanal House did not meet that requirement.

70. Once a fire gets into the corridor smoke etc will be free to travel
both the full length of this corridor and up and down the building via
the lift shaft. If a fire door to the stairs is open or missing then the
stairs will become smoke logged.

71. If a vertical duct has no fire stopping at each floor level and either
its enclosing walls are not 1 hour or if it has an unprotected timber
access panel then it is not a "protected shaft" at all. It will allow fire to
spread up and down the building as burning embers fall and these can
burn through either the enclosing wall or panel or even both of them if
it is fierce enough.

72. There are at least two further ducts within the flats. I have not
been able to inspect these ducts in detail. One of these is in the
bathroom wall behind the end of the bath. This wall is flush at that
point. It is hollow when you tap it. On the other side of the wall
containing this duct appears to be another duct. Given the thickness of
the wall it is difficult to see how 1hour fire protection has been
achieved.

73. If these ducts are not fire-stopped at each floor level then fire can
and will pass down the duct as burning embers fall. If the duct beside
the internal timber stair had no fire stopping at floor level as we found
in one of the ducts in the lift lobby then burning embers could have
fallen down the duct and started fires in lower flats.

74. These fires in the lower flats appear to have started from inside
the flats rather than from burning objects falling down the outside of
the block. This can be seen on Video B.

75. All of the timber framing to the false ceilings in the access
corridors in Marie Currie was being removed on Friday 31st July.

76. Cable trays were being provided to support the electrical wiring.

77. A new fire door had been provided on one of the upper floors.

78. Fire notices, floor numbers and flat numbers were being fixed to
the walls.

NEW EXTERNAL FAÇADE

79. The external façade was replaced on Lakanal some two years ago
and new kitchens were fitted. No doubt these were both welcomed by
the tenants at the time as considerable improvements.

80. No tenants should in anyway feel guilty about agreeing to the
façade being fitted to Lakanal especially if their views were sought as
members of the Tenants Association or in any poll conducted by the
council or the TA.

81. The tenants are not technical experts.

82. When the work to the façade was carried out it was probably in the
transition period between the Fire Precautions Act 1971 being
repealed and the Regulatory Reform (Fire Safety) Order 2005 coming
into force in 2006.

83. The whole of the Fire Precautions Act 1971 was repealed.

84. Parts of s20 of the London Building Acts (Amendment Act) 1939
were repealed but the main force of it remains.

85. Facades of buildings of the scale of Lakanal must not be
constructed so they support fire or its spread. It appears that parts of
the façade are some form of plastic material. This material can be
clearly seen melting and softening in the fire and burning.

86. Why was this material allowed?

87. Who authorised the use of flammable materials on the façade of
Lakanal when the regulations clearly forbid such widespread use in a
s20 building?

SELECT COMMITTEE ON POTENTIAL RISK OF FIRE SPREAD IN BUILDINGS
VIA EXTERNAL CLADDING SYSTEMS JULY 1999

http://www.publications.parliament.uk/pa/cm199900/cmselect/cmenvtra/109/10907.htm#a1

88. Following a serious fire in a block of flats in Irvine Ayrshire on 11th
June 1999 involving external cladding the Environment, Transport and
Regional Affairs Committee agreed the above report.

89. The committee did find evidence of risks from fire spread with
certain claddings.

Para 9. Witnesses to our inquiry.......suggested that the guidance in
Approved Document B (Building Regulations) may not be adequate for
the purposes of ensuring the safety of external cladding systems in a
fire.....

Para 10. Witnesses chief concerns lay with the risk of unexpectedly
rapid fire spread involving these systems, which, it was suggested,
may have a number of adverse consequences of which the existing
guidance does not necessarily take full account. These are:

  • Shorter period for escape from the building, thus potentially
endangering life
  • Disproportionate difficulties in firefighting
  • Disproportionate damage to the building

Para 11. Witness also raised a number of other potential problems of
which existing tests may not take proper account:

  • The fixtures which attach the cladding to the building may not
withstand the fire, risking the detachment of the system from
the building and endangering persons in and around the building,
including firefighters
  • If plastic materials are used for the cladding, they could melt and
form burning droplets which again endanger people below
  • Certain material could degrade over time and become less
resistant to flame spread than they were at the time of
construction.

Para 19. .......we do not believe that it should take a serious fire in
which many people are killed before all reasonable steps are taken
towards minimising the risks.

90. The report was written 10 years ago. It is freely available on the
Parliamentary website

91. One change which did come as a result of this report was the
consolidation of over 70 separate pieces of existing fire safety
legislation into the Regulatory Reform (Fire Safety) Order 2005.

92. Different fire authorities may have had their own special pieces of
fire safety legislation and this accounts for slightly different totals
being given.

THE CONSTRUCTION (DESIGN & MANAGEMENT) REGULATIONS 2007

93. CDM Regs 2007 replaced the first CDM Regs 1994.

94. CDM requires a positive health and safety approach to the design,
construction, future management and maintenance and finally the
demolition of buildings. CDM also applies to work on existing buildings.

95. As the HSE say on their website:

http://www.hse.gov.uk/construction/cdm/legal.htm

"Construction remains a disproportionately dangerous industry where
improvements in health and safety are urgently needed."

96. I was one of the representatives from the Royal Institute of British
Architects who formed the working party with the HSE, other
construction professions and the construction industry in the
formulation and drafting of these new regulations.

97. When work is carried out on existing buildings they fall under the
remit of CDM whenever they were originally constructed.

98. Work relating to the façade of Lakanal and any of the other
buildings on the Sceaux Gardens Estate would have fallen under one or
other of the sets of CDM Regs since 1994. If the contract period had
spanned both sets of CDM Regs then the latest CDM would have taken
precedence immediately it came into force.

DEFINITIONS UNDER CDM 2007

99. CDM 2007 places legal duties on virtually everyone involved in
construction work. The four key "dutyholders" are the client, the CDM
co-ordinator, the designer and the principal contractor.

100. A 'client' is anyone having construction or building work carried
out as part of their business. This could be an individual, partnership or
company and includes property developers or management companies
for domestic properties and local authorities.

101. A 'CDM co-ordinator' has to be appointed to advise the client on
projects that last more than 30 days or involve 500 person days of
construction work. The CDM co-ordinator's role is to advise the client
on health and safety issues during the design and planning phases of
construction work.

102. The term 'designer' has a broad meaning and relates to the
function performed, rather than the profession or job title. Designers
are those who, as part of their work, prepare design drawings,
specifications, bills of quantities and the specification of articles and
substances. This could include architects, engineers and quantity
surveyors.

103. A 'principal contractor' has to be appointed for projects which
last more than 30 days or involve 500 person days of construction
work. The principal contractor's role is to plan, manage and co-ordinate
health and safety while construction work is being undertaken. The
principal contractor is usually the main or managing contractor for the
work.

104. The Client, in this case the London Borough of Southwark, must
appoint a CDM co-ordinator for the work involving the replacement of
the façade of Lakanal.

105. The role of the CDM co-ordinator is to advise the client on health
and safety issues during the design and planning phases of
construction work.

106. A file, known as the Health & Safety File starts at the
commencement of the design work, in this case the design of the new
façade.

107. This H&S File can be in paper or electronic form and it lasts until
the building is demolished.

108. One of the main components of the H&S File is the Risk
Assessments.

109. One of the Risk Assessment, which must be in writing, would
have covered the façade.

ASBESTOS

110. On Friday 31st July I was concerned that some the materials being
removed might contain asbestos.

111. This material had been protecting the underside of the timber
stair from any fire in the corridors.

112. It did not protect the corridor from a fire in any flat.

113. Asbestos is a major health hazard. Every week 35 workers in the
building industry die from former exposure to asbestos. (HSE Hidden
Killer Campaign http://www.hse.gov.uk/asbestos/ ).

114. I raised the possibility of this material being asbestos with Cllr
Wingfield and the forewoman in charge of the Morrisons contractors on
site. She phoned her boss Mark Warlidge of Morrisons and he came
over with the test certificates. These all showed that no asbestos was
found in any of the many samples tested.

115. The test certificates were handed over to Cllr Ian Wingfield for
safe keeping.

116. It would seem from this that the asbestos was removed when the
new false ceiling was put in around 1987. Many councils had
programmes to do this at the time.

117. Southwark Council should have a log showing when all of this
work was done. This will either be in the form of a paper file or an
electronic one so it should be easy to produce this information quickly
and this will pin point exactly when the false ceiling was constructed.

118. The asbestos removal in 1987 raises some serious new
questions.

  • What steps were taken to protect the health of the many 100s
of tenants in Lakanal and Marie Currie when this asbestos was
removed?

  • Were the tenants decanted from the block?

  • Or were they decanted from each floor while the work was
carried out?

  • If not why not?

  • Who carried out this work and what Personal Protective
Equipment (PPE) was issued to the workmen carrying out this
work by their employers?

119. This should all be recorded in Risk Assessments from 1987 and I
would expect this information to be included in the Health & Safety File
for the contract for replacing of the façade two years ago.

120. These Risk Assessments concerning asbestos removal in 1987
must be written before work commenced on site. These documents
are part of the contract documents and should be relatively easy to
find. The requirement for this to be done was part of the Asbestos
Regulations at the time.

THE SINGLE ESCAPE STAIR

121. The provision of a single stair with two long dead end corridors
for Lakanal met the requirements of s20 of the London Building Acts
to the satisfaction of the District Surveyor at the time this building
was constructed 50 years ago.

122. The underlying principle of s20 was safety of life.

123. Alternative means of escape routes were provided apart from the
main entrance door to each flat.

124. There are two open narrow escape balconies accessible from the
living room and kitchen on the floor above the bedrooms and entrance
level to each flat. These are on opposite sides of the building and lead
to the central escape stair.

125. Another escape route is via a half height hatch door from the
main bedroom through a fullsize door into the access corridor. This
was to allow people to escape if they were trapped in this bedroom by
fire and couldn't get out by the main front door to the flat.

126. It was normal to assume that the people who were on the floor
where the fire occurred and those on the floor above the fire could
escape safely.

127. The speed at which this fire developed and its ferocity rendered
such escape to the central staircase for people on the 9th floor and
above impossible unless they escaped immediately.

128. The principle of s20 working safely so that people were not in
danger, relied on each flat being a 1 hour fire compartment and the
main corridor being a 1 hour fire compartment.

129. It would appear from what happened on 3rd July inside Lakanal
that this was far from the case.

130. One only has to realise from what can be seen at the beginning of
Video B that it was totally impossible to use the narrow external
escape routes to get to the escape staircase on floor 9 and above.
This applied all the way up to the top of the building at the 14th floor.

131. For anyone on these floors to be safe then the building would
have to have had 1hour fire resistance.

132. That would mean they could safely stay in their flats until rescued
by the fire brigade.

133. This is what the fire brigade members who attended the fire
believed.

134. It is obvious from what happened that it wasn't a 1 hour building
and still isn't.

THE FIRE SAFETY ORDER 2005

135. The following is from Essex Fire & Rescue Service:
http://www.essex-fire.gov.uk/pages/index.asp?area=6&id=31

The Fire Safety Order (FSO) 2005 became law on the 1st
October 2006, replacing 118 pieces of legislation, repealing the Fire
Precautions Act 1971 and revoking The Fire Precautions (Workplace)
Regulations. At a stroke, all fire certificates and plans have ceased to
be valid and the highly prescriptive standards set by the Fire
Service have been replaced by a system of risk-based assessment,
whereby accountability lies squarely and firmly with 'the responsible
person' in any business.

No longer is it the Fire Service's duty to make sure the workplace is
safe. That duty lies with 'the responsible person' and they will be
held accountable under the new legislation.

Fire Protection Officers will audit the fire risk assessments and
associated documentation relating to any premises and at the end of
the premises' audit, the 'responsible person' will be informed of
their compliance level. If there are matters of concern, then the FPO
may use their powers of enforcement.

These powers vary from educating and informing (discussing action
plans), notification of defects to be rectified, an alterations notice, an
enforcement notice, a prohibition notice and possible prosecution.

136. Further information can be found on
http://www.communities.gov.uk/fire/firesafety/firesafetylaw/

137. The new legislation places the responsibility firmly on the
shoulders of the building owner or organisation managing the premises,
the responsibility for managing the building safely.

138. Southwark has a duty of care to its tenants, leaseholders and
anyone visiting or carrying out work for their lives not to be put at risk
by a fire in Lakanal or Marie Currie or any of their buildings. As a
corporate body it is responsible under FSO 2005.

139. Southwark has a legal responsibility to appoint a "responsible
person" under the FSO.

140. This person has to be sufficiently senior in rank for their views to
carry weight.

141. They should report directly to the Chief Executive in the same
way that the Health & Safety Adviser does.

142. The Chief Executive is ultimately responsible.

143. Failure to appoint would mean that the Chief Executive becomes
the "responsible person" under the FSO.

144. The "responsible person" has to be given adequate training and
adequate funding must be set aside for both their duties and training.

145. Their salary has to be commensurate with their responsibility.

146. They have to write a risk assessment of the buildings they are
responsible for.

147. It is a very responsible role.

WHY WAS THE TIMBER FALSE CEILING REMOVED IN MARIE CURRIE
AFTER THE FIRE?

148. Immediately following the fire the removal of the false ceiling in
Marie Currie began.

149. This work would never have been undertaken if there had not
been a fatal fire in Lakanal and that risk would have remained.

150. It was not a question of "if" a fire occurred in Lakanal or Marie
Currie but "when".

151. Any fire in any one of nearly 200 flats in both blocks of sufficient
intensity would have burned through the unprotected side of the
timber stairs at the top.

152. This would have resulted in the fire protection falling into the
false ceiling and releasing a wave of superheated air which would cause
flashover inside the false ceiling.

153. Once that happens in a fire everyone inside the building including
the fire brigade are at risk.

154. That is why the timber false ceiling has been removed in the
access/escape corridors.

155. Why should it take the deaths of six innocent people before that
risk was removed?

156. Why was it there in the first place?

CONCLUSIONS AND MINIMUM REQUIREMENTS FOR SAFETY IN LAKANAL
& MARIE CURRIE

157. Parts of the new façade on Lakanal aided the fire in its passage
up the building. Press photographs and videos show the softening and
burning of the spandrel panels under the windows.

158. Any façade on a s20 building should be Class O.

159. The holes through the corridor walls and ceiling where the top of
the internal maisonette timber stairs cross over and breach the 1 hour
fire compartmentation are a major weakness in the original design.

160. These holes require fire stopping to at least 1 hour in such a way
that any fire proofing cannot fail due to a fire either inside or outside
the flat.

161. A building on the scale of this and housing so many people today
would require more escape stairs and a sprinkler system.

162. Ideally these escape stairs would be at each end of the
access/escape corridors. These new stairs would require additional
security to prevent unauthorised entry to the buildings.

163. These two buildings are high risk and should have a foolproof fire
alarm system wired to the local fire stations.

164. A check should be made to every duct, horizontal or vertical
throughout Lakanal and Marie Currie to ascertain if they meet 1 hour
requirements. If they do not they should be brought up to standard.

165. Particular emphasis should be placed an inspection of how and
where pipes pass through floors and walls and whether access panels
to the ducts are capable of resisting the passage of fire from both
sides.

166. A sprinkler or fire suppression system should be fitted in the
common areas of Lakanal & Marie Currie.

167. Similar checks should be made in respect of fire safety on ALL
the other blocks on the estate.

168. Particular emphasis should be placed on means of escape for
families with small children, the infirm and disabled. Are the current
arrangements suitable and safe especially at night?

169. These safety measures are minimum requirements.

NOTES ON THE BACKGROUND TO THIS REPORT

170. This report has been written with the knowledge gained from 2
visits inside Marie Currie with Mike Baker accompanied on one by Cllr
Wingfield to inspect every common level and a visit inside the flat of
Mr & Mrs Wright in 43 Marie Currie. A first visit to the site was made
the day after the fire.

171. No one has been allowed inside Lakanal.

172. Marie Currie which is identical in planning and layout on the flat
floors with Lakanal has not had the refurbishment carried out that
Lakanal had although Tony Bird and I understand that a similar
refurbishment was pending sometime in the future.

173. Other lower blocks such as Colvert have had new façades fitted.

174. The fire took place in the afternoon of a fine sunny day yet six
people died three of them young women.

175. What would have been the outcome if this fire had occurred at
4am instead of 4pm?

176. Are the current escape arrangements adequate?

177. It is evident that even without the addition of the new façade
that elements of the construction and means of escape in Marie Currie
present a major fire risk to the tenants.

Sam Webb RIBA
9th August 2009

Ammendment (a) paras 49, 50 14/08/09

WESA_5_4_02p1
1 of 50