Dear Peter, 8 July 1985
Morris Walk Estate Greenwich
Enclosed as Promised following our discussion last week my report to Greenwich made on behalf of the tenants.
As you know the blocks are 'H' shaped on Plan,and consist of 3 separate elements or towers; two wings of flats and the lift stair tower. The stairtower is linked to the flats by short lengths of corridor made up of 'simply supported' slabs.
During the investigations it became apparent that the 10 storey stairtower was not too stable in high winds with Peak gusting. Both the Engineers for the tenants and myself are concerned about this. I am also concerned as you will see in my report about the workmanship in the joints, particularly joints like the H2 which can only be reached from one side. The original H2 worked out by Larsen and Nielsen had a concrete upstand against which it was Possible to ram the dryPack. This joint was subsequently amended by Phillips Consultants with no restraint for the dryPack along the outer edge. I consider that the H2 Joint as used at Ronan Point, Morris Walk, and Broadwater Farm Haringey is virtually imPossible to construct ProPerly as the dryPack falls out along the outside edge due to lack of restraint. This leads to voids in the dryPack and the load of the walls being unequally distributed on the lifting bolt nuts and the Post Ronan Point strengthening angles.
When the H2 Joint was oPened uP in Ronan Point last SePtember it was found that the amount of steel in the joint Prevented concrete Passing the bars, this led to voids being formed. In my drawings I have marked one the Joints 'Z'and i think there is a strong Possibility that voids may be Present here too. As this is in the stairtower it should be treated with some urgency. I am not sure if these joints have in fact been given a radar scan.
The angles added in 1969 after Ronan Point fell down were only designed to resist horizontal loads from exPlosions. They were never designed to hold the floors uP. In 1970 I had some discussions with Eric Bunn about this, and also had a letter from Sir Hubert Bennett who both told me that these angles could never become loaded.However these angles are now holding uP the floors of the 6 Ronan Point tyPe blocks and David Adler thinks a similar situation has occurred in the 14 storey Aintree Blocks. In the short termthis may marginally be sufficient but in the long term or under adverse loading conditions i.e. LPG exPlosions or possibly in a fire the loadbearing caPacity of the wall becomes unPredictable.
During the meeting with Henry Colley on May 17 I was a little surPrised to find that he had not seen a rePOrt that Hackney's Engineers had made on their own TWA Estate, esPecially as it had been Published 5 months earlier. I gave him a coPy.
At that meeting Henry said there was no need to do anything about the stairtower or the H2 joints. However by the following Tuesday
[continued]
May 21 when there was a Public meeting he announced that the stairtower would be strengthened and the dryPack in the H2 joints would be rePacked by underPinning the walls 100mm a time in the bottom four storeys of the 10 storey blocks. He also said that the workmanshiP was worse on Morris Walk than later estates and a short Precis rePOrt was issuedat this meeting.
The LCC/GLC built 11 TWA estates, two of 14 storeys at Aintree and Barley Mow, and the rest 10 and 7 storeys.
At all meetings until 21 May it was catagorically stated that the workmanshiP on Morris Walk was above average because it was the first TWA scheme in the UK. Itnow aPPears from Henry Colley that it is among the worst.
What worries me is that enormous sums have been sPent by the Boroughs and the GLC on surveys of these estates. Until Fothergill and I looked at Morris Walk from structural first PrinciPles no one had ever questioned the initial structural asSumPtions PhilliPs Consultants Ltd the TWA subsiduary who designed the structure. Last year I was told in meeting after meeting that nothing was wrong with Ronan Point. This view was held by the BRE, George Iley of Newham, BDP, Thos. Ackroyd and the FRS. Now the BRE say 8 floors must be removed to make it safe. Their other idea for a frame to hold it uP would only ensure as Sir Frederick Snow and Ptnrs said in a 1969 RePOrt to Newham that: 'in the event of an exPlosion the contents of the building Plus it's inhabitants would be neatly contained as they fell, by the frame'.
The BRE have given no calculations to Newham or any methods or costings. Until the Seminar on TWA at the GLC in February the BRE ProPosed the frame for the full height. A question from the floor from Barry Russoff of Phillips led John Menzies of BRE to knock 14 floors off the frame. Eight floors of Ronan Point brings it down to the same height as Aintree yet no one had ever checked it's ability to withstand high winds. Certainly BDP had not looked at the effect of windloads on Aintree. Of course as you know wind loading on a 14 storey block is very much higher than a 10 storey one.
Last week a grouP of tenants from some REEMA Estates met Menzies at the DOE. It had not occurred to the BRE that even with uPgraded heating LPG might still be used by tenants for cooking if electricity was cut off for non Payment of a bill.
Next year the GLC will be no more, but the TWA estates will remain. If anything haPPens in those flats in the future then very serious questions will be asked, and I have no doubt that whoever is Minister at the time will want to know why when Morris Walk was decanted once again for strengthening that higher blocks of flats of identical construction were left.