Skip to main content

Content Warning

Archive material discusses fatal building failures and contains potentially distressing elements.
WESA_5_3_06p1

Letter, 'Morris Walk Estate'

ARCHIVE DOCUMENT
6 December 1984
Start of document

DIRECTORATE OF HOUSING SERVICES
LONDON BOROUGH OF
GREENWICH

PEGGY MIDDLETON HOUSE,
50, WOOLWICH NEW ROAD,
WOOLWICH, LONDON SE18 6HQ
01-854 8988 EXT. 3705

GEOFFREY FILKIN
DIRECTOR OF HOUSING SERVICES

YOUR REF.                                    MY REF. JP/JH
                                             DATE   6 December 1984

For the attention of R Tant

Budgen & Partners
54 Queen Anne Street
LONDON
W1M 9LA


MORRIS WALK ESTATE

I would like to confirm your recent telephone conversation with J Clay.  We would like to brief Structural Engineers to give an independent report on the structural stability and safety of the Morris Walk Estate, which is built on the Taylor Woodrow Anglian system.  The report will be made to the Tenants Association, but you will be appointed and paid for by the Council.

The Council has agreed that the final choice of consultant lies with the tenants, and we will be interviewing one other Structural Engineering Practice, besides yourselves.  At the interview on Monday 17 December at 4.45 pm, those present will be myself, J clay (Tenants Liaison Officer), 2 tenants representatives and Mr S Webb.  The Council has agreed that Mr Webb can advise the tenants on their brief to yourselves, and he has prepared a list of 10 points to be covered in the final report.

1.  The history of Larsen & Nielson/Taylor-Woodrow Anglian.
2.  Danish Practice - Danish Codes etc.
3.  Ronan Point.
4.  The implications of the Public Enquiry Recommendations.
5.  The bolted angles and the dual standards of 2.5 psi and 5 psi.  Statements made at various times by the GLC, the Minister of Housing, Newham, District Surveyors etc.
6.  Explanatory 3D drawings of joints showing how the structure works and how it was put together.
7.  How the structure changed from Estate to Estate.
8.  An assessment of the problems likely to arise or to be found at Morris Walk.  This could include drawings.
9.  How these problems could be rectified or not as the case may be.
10.  Conclusions and Recommendations.

[continued]

Budgen & Partners
6 December 1984

The first 5 points are introductory and Mr Webb has a great deal of information available on these.  The last 5 points would form the main body of the report.  I must, however, emphasize that the structural stability and safety of Morris Walk forms the main thrust of the report.

Morris Walk was transferred to Greewich by the GLC and they retain responsibility for capital work on the Estate.  Their Structural Engineers, together with their Scientific Branch, have undertaken various investigations and this report is in the process of being finalised.  This will be made available for you to comment on.  Geoscience Ltd are also in the process of carrying out radar surveys to the Estate.  Norman & Dawbarn have been retained by the Council to give the Council independent advice on the GLC's findings, but should be considered as if they were the Council's in-house Engineers ie as part of the clients team.  We have various drawings provided to us, of Morris Walk, which would be made available to yourselves.  We have also opened up various joints in one flat.  You will be asked to comment on the validity of the Council's (and its advisors) findings and conclusions to date.

Please would you let us know your hourly rate and the name and status of the person (or people) who could be involved.

I look forward to meeting you.


[signed]

Assistant Director of Housing Services
(Technical)


cc Director of Housing Services
   S Webb
   Councillor M Yates
   J Clay (Area Manager - Charlton)

WESA_5_3_06p1
6 of 70