WESA_4_2_09

Letter from Fothergill Consulting Engineers to Morris Walk Tenants Group

ARCHIVE DOCUMENT
Start of document

Directors
Michael Fothergill MA CEng MICE MIStructE
David Dixon MA MSc CEng MICE
John Wyatt BSc CEng MICE MIStructE
Associate
Michael Quinlan MA CEng MICE MIStructE
Consultant
George Alexander MA CEng MICE FIStructE MConsE

MORRIS WALK TENANTS
NEWSLETTER

fothergill
and Company
Consulting Engineers

62 Hill Street
Richmond
Surrey
TW9 1TW
telephone 01 948 4165

our reference
your reference

17th May 1985
also at Bristol

Dear Tenant,

PART I : Introduction

For those of you who are unfamiliar with our work and how we came to be employed by you, let me explain. Fothergill and Company are a firm of Consulting Civil and Structural Engineers. In December 1984 we were invited to submit proposals on how we would set about preparing an independent report to the Tenants Association on the structural stability and safety of the Morris Walk Estate. We were interviewed by Greenwich Council and representatives from the Tenants Association and were told that the final choice of consultant would lie with the Tenants. We were subsequently pleased to hear in late December that we had been appointed to carry out the work.

What have we done ?

During our investigations into the problem, we have studied reports and construction drawings of the Estates, and studied the history of the work on Ronan Point. We have surveyed a number of flats on the Estate and observed the uncovering of previously hidden construction joints. In addition, we have prepared our own calculations to assess the stability of the buildings and made extensive enquiries into their fire and explosion resistance. All conclusions reached and recommendations made by us have been arrived at independently without interference from other parties. I would like to add at this stage that throughout our work we have received full co-operation from the London Borough of Greenwich and are most grateful for this.

Our full report entitled "Report to the Tenants of the Morris Walk Estate on the Safety and Stability of the Buildings" was issued on 3rd May 1985. Copies of this report have been sent to members of the Morris Walk Action Group and are available for you to read if you so wish. The purpose of the second part of this Newsletter is to outline the findings in our report for quick and easy reference.

1

Company secretary F S A Fothergill FCCA
Proprietors
Fothergill and Company Limited
Registered Office
62 Hill Street Richmond Surrey TW9 1TW
Registered number 1418599

fothergill
and Company
Consulting Engineers

PART II : The Findings of F & Co. Report

Please note that this is a very brief resume of our report and you should read the full report. PART III of this Newsletter is a copy of our Conclusions and Recommendations from the Full Report.

1. Difference between Morris Walk and Ronan Point

Our initial investigations led us to the early conclusion that the Morris Walk buildings were very different from Ronan Point.
- In plan the buildings are different shapes.
- Ronan Point is 22 storeys tall, Morris Walk is 10. This not only reduces gravity loads but considerably reduces the wind loads on Morris Walk.
- At Ronan Point, much of the attention was focused on the H2 joint between the end walls and the floor slabs. We have concluded that, even if the workmanship was twice as bad as Ronan Point, Morris Walk is still safe.

2. Fire Resistance

In the wake of the fire test at Ronan Point, the GLC developed and tested a fire detail to prevent both the passage of smoke and flame from one flat to another and direct fire attack to the floor. We have recommended the installation of these details on all flats at Morris Walk. (See also No. 5 below).

3. Explosion Resistance

In 1968 the 10 storey blocks at Morris Walk were strengthened with steel angles to withstand a blast of 2.5 p.s.i. on the basis that gas would not be used in these blocks. The increasing and widespread use of bottled gas, however, has increased the possibility of an explosion to an unacceptable level. We have concluded that bottled gas must be prevented in the flats at Morris Walk and an alternative cheap heating system be provided. See also No. 5 below.

4. Heating and Condensation

Our investigations have led us to the conclusion that condensation is not a widespread problem on the Estate and that the construction of the buildings is not the principal cause of the condensation problems. It is our opinion that the installation of a cheap and effective heating system, together with the simple control of moisture in the air through ventilation, will solve the general problem. Individual serious cases will, however, be dealt with separately.

5. Strengthening

We have recommended a number of structural strengthening measures and would refer you to the full report and PART III of this letter report for further information. The most important aspect which we would like to mention here, however, is our recommendation that steel angles be installed in the 3 storey blocks to improve the behaviour of the buildings in shear, fire and explosion.

2

fothergill
and Company
Consulting Engineers

PART III : Conclusions and Recommendations

Even before site investigations have been completed, we can reach certain conclusions and recommendations.

1. The GLC fire proofing detail should be installed as a matter of urgency.

2. The use of bottled gas in the flats should be prevented. This will require the installation of a cheap effective heating system.

3. The London Borough of Greenwich will need to make periodic inspections of the flats to monitor the progress of the deterioration of the concrete and to remove loose debris.

4. At Morris Walk, the H2 joint is almost certainly satisfactory.

5. Steel angles should be installed in the 3 storey blocks to improve the behaviour of the buildings in shear, in a fire, and in an explosion.

6. The non-loadbearing side panels are fixed to the crosswalls to improve wind stability and to relieve high shear stresses.

7. Wall W5 is to have steel straps at the lower floor levels to improve the factor of safety in wind.

8. Strengthening details to the lift and stair block are to be developed to ensure box-like action.

9. The bridging slabs between stair and residential blocks are to have revised seatings so that relative movements can be tolerated without loss of integrity.

10. All the strengthening works are to be fire-protected in line with current practice.

3

WESA_4_2_09
15 of 17