Meeting of Morris Walk Action Group with Director of Housing

MEETING OF MORRIS WALK ACTION GROUP WITH DIRECTOR
OF HOUSING
ON
THURSDAY 11TH APRIL 1985
Present:-
S.W. Sam Webb, R.I.B.A.
B.J. Councillor Bill Jeavons
G.F. Geoffrey Filkin, Director of Housing
T.E. Tony Eallett, Principal Technical Officer, Charlton
P.S. Phillip Stiles, Chairman, Morris Walk Action Group
M.S. Maxine Stiles, Morris Walk Action Group
M.H. Martin Hoctor, Senior Assistant Area Housing Manager
J.C. Jonathan Clay, Tenant Liaison Officer, Charlton
G.C. Graham Cosway, G.L.C. Divisional Head
1. TECHNICAL PROGRESS
G.F. outlined the progrss so far. He explained that he was not involved in meetings involving technical complexity. He suggested a need for some certainty as to whether the buildings are safe. He said that three engineers are at work; G.L.C. Norman and Dawbarn for Greenwich and Fothergills on behalf of tenants. G.L.C. and Norman and Dawbarn are being pressed for their reports, hoping for written reports by the end of April. Only then can reports be compared.
P.S. commented that he was reluctant to put a time limit on Fothergill's work. He felt that they had not had enough time on site and that there was a need for further investigations.
G.F. requested that Fothergills be asked when they expect to report finally.
B.J. asked how long it would take to process the information.
G.F. suggested that it was unlikely that the Council would have "a view" before the end of May. The reports and costs had to be related to funding from G.L.C. then decisions about funding would follow and any contracts would follow finally.
G.F. saud tgat we are "in contract" for window replacement in first three blocks. L.B.G. has been pressing for contracts to be extended to all seven high rise at member level discussions (between Chairs of Housing KBG/GLC). If by the end of May it is found that the buildings are worth improving then need to start bidding now for money for the rest of the high rise.
P.S. said that low rise should also have windows replaced with double glazing, if not rehabilitated, then 76% of tenants in low rise did not wait to stay there. They suffer from both road and railway noise.
G.F. agreed that low rise need new windows as much as high rise. A G.L.C. Officer is being briefed to investigate the contract but as yet there was no firm commitment.
B.J. commented that his information suggested that low rise had never been strengthened.
G.F. confirmed this.
- 1 -
S.W. said that condensation was much more severe problem on Morris Walk than at Ronan Point, even if buildings are proved safe, unless adequate cheap heating to warm the structure is provided, then LPG heater use will always be a danger.
T.E. described the specification for new windows, galvanised steel with pivots, powder coated finish with double glazing to high performance specification.
P.S. expressed concern that window replacement was pre-empting engineers reports on overall condition.
G.F. replied that we have to get on with it.
S.W. asked who would service OBRAC heating system? they felt it was over-complex.
P.S. said that tenants don't want OBRAC, they want individual control.
G.F. said that Greenwich will define user specification and consult with tenants over what heating system tenants want. This specification will then be put to G.L.C. and they can appraise OBRAC against it and compare capital and running costs. Similarly, the L.E.B. will be asked to appraise any system of heating and comment on capital and running costs.
P.S. stated that OBRAC was as yet unproven. Many difficulties have emerged during trials at Ocean Estate, Tower Hamlets.
G.F. commented on high cost - £2.7 million just for maaterials, approximate cost per flat = £9,000.
S.W. commented that his central heating cost £1,500.
M.H. commented that Rockmount storage heaters allowed day time boosts.
G.F. stated that we had the experience of one winter with Rockmount. It is a Landlord controlled system - prevents "heat robbing" from other flats.
P.S. commented that antisocial tenants were often tenants that don't want to be there on the estate. He suggested that they ought to be transferred.
S.W. asked if the estate was classified hard to heat.
G.F. confirmed that it was.
B.J. commented that the problems of the estate were due to political situation, that there was not enough subsidy available. He stated that condensation was very bad.
G.F. said that work was taking place to install entryphones in three blocks and L.B.G. are waiting for confirmation for the other four blocks.
S.W. said that it was important that the fire brigade could get in.
G.F. asked Tony Eallett to check on this with Peter Tozer from the G.L.C.
B.J. commented on the good atmosphere at the meeting.
G.F. said that waterproofing to prevent spalling concrete was undergoing trials and that they were close to a solution.
S.W. produced a piece of Viking House as evidence of recent concrete breakdown. He commented on bowing of staircase panels.
G.F. asked Tony Eallett to request Norman and Dawbarn and the G.L.C. to check staircase panel bowing. He said that it was hoped that waterproof scalent could be applied when the scaffolding was there for the windows.
- 2 -
P.S. pointed out that workmen are on site working on flats without notifying tenants.
G.F. said that there was a need to establish liaison with tenants during works.
B.S. commented that he would like to see extra staffing.
G.F. said that they were awaiting G.L.C. report on smoke and fire works.
S.W. expressed disagreement with Fothergill report of Ronan Point fire test. He described the history of the Ronan Point fire concluding that there had been significant smoke penetration, shearing of floor/ceiling slabs and movement of flank walls.
B.J. asked if it would be necessary to have a fire test.
J.C. said that Fothergills must fully justify their statements.
P.S. said that if Fothergills say that there is a risk from fire then there is no need for a fire test.
G.F. said that L.B.G. has been pressing the G.L.C. for lift replacement as they are 20 years old and approaching the end of their useful life. They are looking at leasing arrangements.
2. FINANCE
G.F. pointed out:-
i. G.L.C. is under threat of abolition which adds urgency to getting things let in contract.
ii. There is competition for money which is very severe.
iii. We have been pressing Tony Mc.Brearty (Chair of Housing G.L.C.) very vigorously on Morris Walk to commit funding and technical resources. We have not yet had a response. There is no commitment to do fire stopping and strengthening.
P.S. stated that it was important that the estate was treated as a whole and that the two blocks by the railway were not left behind.
G.C. said that the G.L.C. were not deliberately segregating the blocks.
S.W. asked if cost of rehabilitation and redevelopment had ever been compared.
G.F. said that a full financial appraisal was being drawn up comparing rehabilitation with new build and should be ready in one month. He pointed out that while the G.L.C. were obliged to repair, they had no obligation for new build.
B.J. said that when the figures were available we must show them to the D.O.E.
P.S. said that if blocks were decanted and refurbished then tenants will be happy to move back in.
G.C. said that it was important to establish priority for Morris Walk after Ocean Estate. G.L.C. Chair of Housing has not yet decided priority.
3. CONSULTATION ARRANGEMENTS
G.F. suggested that there should be regular (say every 6 weeks) meetings on the estate of officers, members and Morris Walk tenant representatives. These meetings could discuss issues, share facts and involve tenants' representatives
- 3 -
as much as it is realistic to do so. He would personally expect to attend. G.L.C. would attend. Detail needs to be established as to members, chairing etc. He suggested four tenants and four members might be suitable numbers.
P.S. said that he supported his idea.
G.C. said there was a need for consultation during work to resolve problems.
G.F. said that staffing must be sorted out.
S.W. said that when major work was being carried out it was sensible to empty the blocks.
G.F. said that when G.L.C. has said what work it will do then we will discuss how to do it.
4. PUBLIC MEETING
G.F. suggested deferring the meeting until we had all the information from engineers etc.
P.S. wants to have a meeting soon and suggested 25th April and 2nd May.
G.F. will let the Action Group know by the end of Tuesday 16th April.
5. NEXT MEETING
5.00 p.m. on TUESDAY 16TH APRIL 1985. To discuss calor gas, transfers and a tenants' office on the estate.
P.S. asked if the Council would be represented at systems build conference at Manchester (Hulme) on 19th April.
G.F. said that both estate management and technical section will be represented.
P.S. said that they would like to send a tenant representative and Jon. Clay.
G.F. said that what J.C. does in his own time is up to him. He added that there may be possible funding for say half-a-dozen places. Suggested we should try to get representatives from other estates.
MEETING ADJOURNED AT 4.45 P.M.
J. CLAY
12.4.85