Skip to main content

Content Warning

Archive material discusses fatal building failures and contains potentially distressing elements.
IMG_0978

Notes on Inquiry

ARCHIVE DOCUMENT
Not stated
1 August 1968

Andrew RENTON note: He never found out whether his report
was read. It suggested that:

1 Any appliance which might blow up should not be
allowed in these buildings;

2 If you insist on blowing yourself up that should
not affect others;

3 Authorities are main culprits trying to do too much
with too little.

(I wonder who told them they had to finish this Friday?
According to Griffiths, in his enthusiastic days, it would go on
well into August?)

25 And in goes KELVIN SMARTH.

DRY PACK AGAIN. (At least they could have sought an
independent witness. They must know the types TWA
would produce.)

KS to Goodfellow - Could you speak up, please. And later
can't hear Goodfellow.

26 KS responsible for dry pack filling.

Who supervised?

Site Engineer doesn't know name. Foreman Bedwell.
Clerk of Works, doesn't know name.

(Not to REMEMBER these names? They are loath to name
each other, of course.)

First site engineer was Chinese - he can get that out.

27 Ryan produces a letter from Phillips which no-one has
seen, and asks Smarth to read a sentence out loud. Griffiths
and Goodfellow snatch at it before he can do so.

Cement - Letter asked for two to one mixture by volume.

Smarth mixed equal volumes of sand and cement.

Even Tribunal is shaken.

29 Goodfellow - As you get higher up the building it is
permissible to use a weaker mix? And letter is not
strictly accurate. He will willingly recall Mr. Watson.

(Mr. Bedwell and Mr. Cable has not arrived yet. They had
time for Renton. I suppose after Fairweather they did not
want to risk any more all out attacks. Also Pugsley has
pronounced on the pre-eminence of engineers in this racket.)

IMG_0978
493 of 525