Notes on Inquiry

8 Procedure of putting in reinforcing bars.
9 Ho as supervisor. I do not think he ever complained.
Floors to be cleared for other trades so dry pack had
to be finished.
You are continually telling people how to do a job
with this sort of work.
Men laid off and men left but you couldn't say it was for
any specific reason.
He had no difficulties. He did no questioning of importance
of this or that.
10 I cannot recall any difficulties on S.E. corner.
E - You do not recall having to dismantle one or two
sections that had been taken up?
C - Oh yes. Wrong colour.
(He is a complete stonewaller for TWA.)
At end of his questioning Eveleigh says - For the record
I was trying to deal with P. 22 Day 5, Mr. Thomas's
evidence. (Workmen in shop saying they were having
difficulty in getting floors level and taking double
the time raising and lowering panels.)
RYAN - Mixing concrete did not concern CORMACK.
11 Concreting process - It has always been my practice to
visually check each corner.
12 H 2.
If spares were attached to the slab before it was erected
they were stuck on.
With a bostick material. Grey-coloured stuff.
13 If pad replaced immediately it was not stuck on at all.
Process of dropping in floors - 'nice and easy'.
- If windy - two or three tries.
MAY - Dry packer (Bonello - May had forgotten his name).
(P. 3 vol 18). - We mixed dry pack on site and it used to
be a charge hand supervising it all the time.
Cormack - He should have sad foreman instead of chargehand.
May - Whom?
C - Mr. Bedwell.