25 Mr. STANSELL (an architect) left. A qualified architectural
(con) technician took over as a full-time job.
Mr. BURNS glib. Lists Clerks of Works, their duties.
'Workmanship of good standard'. Better than on other 2
contracts.
Importance of checking joints.
Took no particular note of H 2, concerned about vertical
joints.
Q jected to TW.
They altered method.
Remedial work on 3. Groves satisfied.
Dry packing? Not noted particularly, but they always seemed
to be putting it in in correct manner.
Test cubes and their relative strengths.
Fine, 3,000 tests on 21 days. (Figure found to be wrong.
It was 28.)
27 Can recall no instance where dry mortar did not come up to
figures. Only in insitu concrete any test cube failure.
Adjourned for lunch.
28 Question of nuts, slackened off. They were not.
EVELEIGH.
Had he seen Mr. Bates'list of defects?.
Yes, but Mr. Bates was looking at a portion of the
building which had been subject to explosioh and was in
a state of collapse.
Only criticism which worried Burns was where the panel
was 1/4" out.
Swings it on to Mr. Groves.
ANYWAY Burns thinks Dr. Bate (now)wasn't too sure of this
point.
IF Burns had spotted panels 1/4" out he would have had a
complete investigation.
GOODFELLOW.
Levelling the nuts.
B - Of no great importance. In a roundabout way, he's
checked with the B.R.S.