Skip to main content

Content Warning

Archive material discusses fatal building failures and contains potentially distressing elements.
IMG_0914

Notes on Inquiry

ARCHIVE DOCUMENT
Not stated
Unknown
Start of document

2 Bowen recalled.

Mayfield - Dry filling was design to be at 5,700 lbs/sq.ft.
at 28 days (Phillips figures).

This dry pack takes full load of entire flank walls.

3 Non-structural joints, very weak corners.

4 Effects on structure of floor heating, successive thermal
movements causing gradual filling by molecules, agreement
with Clark in breaking of bond, gap - progressive movement
outwards of walls.

Movement on 2 concrete surfaces, changes coefficient of
friction, he would have thought.

5 Power cuts, winter, necessary to design for more than 5 degree
gariation in temperature.

Latchford Day 2 evidence consistent with structural
possibilities.

Concern over extent of collapse. Bars should run from one
flank wall to another.

Bunn's evidence (GLC) different from detail used at RP.

5,6 He points out differences in GLC detail, a better method
though a little more expensive than Newham (RP).

7 Extent of collapse unusual, would NOT have occurred in steel
and structural concrete in insitu framed type, monolithic
box and industrialized concrete in which joints are designed
for and made to develop appropriate interaction between parts.

Doesn't think floors were clamped.

8 RP too rigid. Very little warning of failure - when questioned
about designing against explosion.

Dr. Moore's suggestion (re walls) would increase resilience.

Because buildings of a certain type have not failed over years,
does not guarantee the system.

French publication 1966 European Concrete Committee. He has
ONLY copy. (Lent to him by Tribunal?)

9 He reads marked passages. Page 1 - experiment necessary, and
need to effectively join components. Page 2 - uncertain
10 character of keyed joints.

IMG_0914
429 of 525