GRIFFITHS : I THINK MR
OFFICER JOHN ROBERT KELL CBE CEng MIMechE PPIHVE [illegible] FInstF. WILL NOW
EXPLAIN THE WHINE TO THE SATISFACTION OF THIS COURT
KELL 1 INSPECTED THE VENTILATION ON THE 20TH JUNE .
The belt guard to No. 1 extractor fan on the roof, which is
connected by metal ducts to 4 vertical shafts, which connect
at each floor to grilles in the bathrooms and toilets was
made without provision for the fan and the motor shafts
and the installer appears to have cut the wires to clear the
shafts. The bolts were missing in No. 1 guard, hence the
upper part of the guard was loose, it had been rubbing
on the shafts. The ensuing noise transmitted by the structure
could well be described as like an electric drill. Mechanical
vibration was intended to be isolated by a layer of cork in
the concrete bed of the fan. In forming of the beds, however,
cement had been allowed to skim over the cork, short circuiting
it to some extent, a fault in execution. Furthermore, the
electric conduit to the motor is firmly clipped to the concrete
base and the floor concrete, thus again forming a path for
transmission.

The upper half of No. 2 fan was located with a single bolt which was
without a nut. No. 2 fan was not running.

GRIFFITHS AH, THE GUARD
LOOSE RUBBING ON
THE MOTOR SHAFT
NO CONNECTION WITH THE
EXPLOSION!
PURCHAS Mr. Kell, the ventilation went to areas from the bathrooms and
lavatories through a series of ducts, there was a different system
to take away air in the area of the building near the refuse
chute.

KELL That is right.

PURCHAS And there is no inter-communication between the two?

KELL No.

PURCHAS But one must also remember that there is a natural
ventilation available to everybody in the flats, is there not,
by opening their windows?

KELL Indeed. I should also like to point out that no expansion and contraction had
been allowed for in the main soil pipe