Draft Script, Act II: The Builders

ARCHIVE DOCUMENT
Not stated
Unknown

HALL I have seen too much of the effect of enemy action to take
reassurance on that point lightly.

SIR A.P. And your insistence on straps.

HALL This is a question where theory and practice are a little
in conflict.

SIR A.P. And you were endeavouring to insist that the nuts
tightening the straps down were hard home.

HALL They were. I inspected any number of them to make sure
they were.

V.W. The straps suggested by Mr. Hall were incorporated into
R.P. but they were not done properly (137)

MAY Of the 15 straps and bolts that were inspected when the
first opening up was done, 28th June, 14 were defective.

V.W. I think defective ...

MAY On a 2nd opening up on a large number, none of them
was properly done.

V.W. I wasn't present.

MAY Weren't you told?

V.W. My engineer was of the opinion that the bolts were
sufficiently tightened.

MAY Was that the engineer who was responsible for the
supervision of Ronan Point?

V.W. No, sir ... I am sorry I was under the impression that
B.R.S. was in charge of these tests.

MAY None of the insitu concrete was bonded either to the
reinforcement or to the floor slabs and walls, would you
agree?

V.W. No, I would not, sir, no. But I would not like to
speculate what happened to the concrete as it fell 20 floors.

MAY Insufficient attention had been paid to tying the insitu
concrete to floor slabs or flank walls, in particular the
loadbearing walls. This is not a criticism of consulting
engineers, but of people designing buildings.

V.W. I don't agree with that at all.

GRIFFITHS Mr. Watson, you designed these joints, Perhaps you would
make recommendations to prevent escalating collapse in
future.

V.W. That would take about a week, sir..

GRIF And whether anything can be done abut the buildings existing .. I don't know