Draft Script, Act II: The Builders

ARCHIVE DOCUMENT
Not stated
Unknown

EVELEIGH Before the next witness I would refer the tribunal to CP III
para 304 B(i) concrete floors and roofs if built up for a
distance less than 3 into the concrete walls anchorage should
be provided in the form of ties between the floor and the
flank wall. The engineer who introduced additional ties was
GEORGE HALL District Surveyor, Wandsworth.
GH Yes, I was not satisfied, inter alia, with the anchorage of
face panels to floors in this system, and I did not think
the flank walls sufficiently restrained.
GOODFELLOW Ever since November 1965 it has been general practice to provide
these straps. *The units as delivered on the site were not
*GH in agreement with the details I'd been shown (to tribunal).
You understand the form of construction, I take it? Well I
asked for additional ties in pursuance of my powers under the
byelaws, and three other amendments. In addition to this panels
were being damaged in erection by being winched into position.

They try to interrupt him ... Mr. Hall ..