IMG_0697

Draft Script, Act II: The Builders

ARCHIVE DOCUMENT
Not stated
Unknown

GRIFFITHS repeats with gestures.
GROVES Yes sir.
GRIFFITHS Anyway they appeared to be ramming to you.
GROVES They would probably not use as much effort as on the cross
wall.

MR. CHUNG TAI HO explains his qualifications in scarcely intelligible
English, Chinese accent. I am research student for higher
degree in concrete technology. BSc Hong Kong 1963, post
graduate department for Advanced Studies in Engineering M/C
1964 in soil mechanics. AMICE. Joined Phillips September 1964.
appointed resident engineer on Eldin and Clever Road Projects
April 1967-October 1967, which includes completing of R.P.
BUTCHER You had two or three tower blocks to be concerned with.
HO Yes, quality control of construction and erection. I did
random checks on straps, did not have time to check all
connections. I believe other engineers and Clerk of Works
were also helping.
BUTCHER Were you encountering any unusual problems?
HO Could you repeat that?
BUTCHER repeats
HO No, sir.
EVE(a test question) How was concrete finished, was it trowelled off?
HO Could you repeat that, please?
EVE Trowelled off, boarded off?
HO As far as I can remember, it was trowelled off.
EVE In situ, in two goes?
HO I do not follow you.
EVE You do not remember?
HO I do not have the detailed drawing. I would prefer to have it.
GRIFFITHS Try to picture the work in your own mind... I want to know
exactly how this joint is made ..
HO I am sorry sir
GRIFFITHS repeats
HO As far as I can remember - I cannot be sure - (a bit more)
EVELEIGH I think it is possible you have missed apoint (hand a photograph)
HO I am sorry. I must have missed your question.